| contributor author | Alfred E. Fazio | |
| contributor author | Robert N. Fazio | |
| contributor author | E. K. Tryon | |
| date accessioned | 2017-05-08T21:01:52Z | |
| date available | 2017-05-08T21:01:52Z | |
| date copyright | January 1983 | |
| date issued | 1983 | |
| identifier other | %28asce%290733-947x%281983%29109%3A1%2873%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/36061 | |
| description abstract | The problems encountered in the major reconstruction of an active passenger railway are examined. The requirements of the transportation department are for highly controlled construction operations; however, construction is most economical when the contractor is provided with maximum scheduling flexibility. These seemingly incompatible demands can only be accommodated by an integrated, i.e., construction and transportation, planning effort, similar to that initiated by Amtrak in the Northeast Corridor Improvement Project. Amtrak's experience may prove useful where railway construction must be accomplished under critical train service constraints, particularly in the upgrading of rail lines into high‐speed commuter or regional rail system. | |
| publisher | American Society of Civil Engineers | |
| title | Planning Railway Construction | |
| type | Journal Paper | |
| journal volume | 109 | |
| journal issue | 1 | |
| journal title | Journal of Transportation Engineering, Part A: Systems | |
| identifier doi | 10.1061/(ASCE)0733-947X(1983)109:1(73) | |
| tree | Journal of Transportation Engineering, Part A: Systems:;1983:;Volume ( 109 ):;issue: 001 | |
| contenttype | Fulltext | |