YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Surveying Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Contractor Staking: Saving Public‐Works Dollars

    Source: Journal of Surveying Engineering:;1990:;Volume ( 116 ):;issue: 002
    Author:
    Thomas R. Warne
    DOI: 10.1061/(ASCE)0733-9453(1990)116:2(82)
    Publisher: American Society of Civil Engineers
    Abstract: In 1985, the Arizona Department of Transportation (ADOT) adopted a new program called “Contractor Staking.” Intended to reduce overall construction engineering costs, this new concept has revolutionized ADOT's approach to highway construction. Since that time, several important changes in the contracting industry have occurred. Contractors must now be more cognizant of incorporating timely and quality‐survey activities into their work plans. Meanwhile, ADOT has been able to reduce the time spent on surveying and shift it to the administration and inspection of an increased highway‐construction workload. Analysis has shown that direct costs and savings due to “Contractor Staking” have essentially cancelled each other in the last five years. However, substantial savings have been achieved due to ADOT's ability to administer a larger construction workload with the same number of personnel. In addition, the savings in indirect costs, such as delay claims and claims resulting from survey errors, are real and significant. “Contractor Staking” is a viable approach to maximizing the benefit derived from the public works dollar.
    • Download: (947.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Contractor Staking: Saving Public‐Works Dollars

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/35643
    Collections
    • Journal of Surveying Engineering

    Show full item record

    contributor authorThomas R. Warne
    date accessioned2017-05-08T21:01:15Z
    date available2017-05-08T21:01:15Z
    date copyrightMay 1990
    date issued1990
    identifier other%28asce%290733-9453%281990%29116%3A2%2882%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/35643
    description abstractIn 1985, the Arizona Department of Transportation (ADOT) adopted a new program called “Contractor Staking.” Intended to reduce overall construction engineering costs, this new concept has revolutionized ADOT's approach to highway construction. Since that time, several important changes in the contracting industry have occurred. Contractors must now be more cognizant of incorporating timely and quality‐survey activities into their work plans. Meanwhile, ADOT has been able to reduce the time spent on surveying and shift it to the administration and inspection of an increased highway‐construction workload. Analysis has shown that direct costs and savings due to “Contractor Staking” have essentially cancelled each other in the last five years. However, substantial savings have been achieved due to ADOT's ability to administer a larger construction workload with the same number of personnel. In addition, the savings in indirect costs, such as delay claims and claims resulting from survey errors, are real and significant. “Contractor Staking” is a viable approach to maximizing the benefit derived from the public works dollar.
    publisherAmerican Society of Civil Engineers
    titleContractor Staking: Saving Public‐Works Dollars
    typeJournal Paper
    journal volume116
    journal issue2
    journal titleJournal of Surveying Engineering
    identifier doi10.1061/(ASCE)0733-9453(1990)116:2(82)
    treeJournal of Surveying Engineering:;1990:;Volume ( 116 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian