Improved Method for Locating Centroid of EarthworkSource: Journal of Surveying Engineering:;1988:;Volume ( 114 ):;issue: 001Author:Said M. Easa
DOI: 10.1061/(ASCE)0733-9453(1988)114:1(13)Publisher: American Society of Civil Engineers
Abstract: Location of the centroid (center of mass) of a cut or fill section is needed in roadway earthwork allocations which are designed by the mass‐haul diagram (MHD) and optimization methods. In the MHD, the centroid location is approximated by the point at which there are equal volumes of earth on both sides of the point. In optimization methods, the location is approximated by the midpoint of the section. This paper develops a method for determining more accurately the centroid location of an earthwork section with a level ground across the roadway centerline. The height of the earthwork section is approximated by a second‐degree polynomial and the centroid location is determined based on the moment principle. Special cases in which the section is prismoid, wedge, and prism are presented as well as extensions to accommodate some practical situations. The method is applied to a numerical example and the results show that the method provides considerable improvement over the traditional methods.
|
Collections
Show full item record
| contributor author | Said M. Easa | |
| date accessioned | 2017-05-08T21:01:06Z | |
| date available | 2017-05-08T21:01:06Z | |
| date copyright | February 1988 | |
| date issued | 1988 | |
| identifier other | %28asce%290733-9453%281988%29114%3A1%2813%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/35557 | |
| description abstract | Location of the centroid (center of mass) of a cut or fill section is needed in roadway earthwork allocations which are designed by the mass‐haul diagram (MHD) and optimization methods. In the MHD, the centroid location is approximated by the point at which there are equal volumes of earth on both sides of the point. In optimization methods, the location is approximated by the midpoint of the section. This paper develops a method for determining more accurately the centroid location of an earthwork section with a level ground across the roadway centerline. The height of the earthwork section is approximated by a second‐degree polynomial and the centroid location is determined based on the moment principle. Special cases in which the section is prismoid, wedge, and prism are presented as well as extensions to accommodate some practical situations. The method is applied to a numerical example and the results show that the method provides considerable improvement over the traditional methods. | |
| publisher | American Society of Civil Engineers | |
| title | Improved Method for Locating Centroid of Earthwork | |
| type | Journal Paper | |
| journal volume | 114 | |
| journal issue | 1 | |
| journal title | Journal of Surveying Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9453(1988)114:1(13) | |
| tree | Journal of Surveying Engineering:;1988:;Volume ( 114 ):;issue: 001 | |
| contenttype | Fulltext |