YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Partially Automated Grading: Construction Process Innovation

    Source: Journal of Construction Engineering and Management:;1988:;Volume ( 114 ):;issue: 001
    Author:
    C. B. Tatum
    ,
    A. T. Funke
    DOI: 10.1061/(ASCE)0733-9364(1988)114:1(19)
    Publisher: American Society of Civil Engineers
    Abstract: The innovativeness of the construction industry has been both defended and debated. Innovative solutions to construction challenges have occurred, however, despite many hurdles. The partial automation of earthmoving equipment using laser‐guided controls, one such advancement, is the subject of this paper. This latest generation of a fragmented family of construction laser applications is a cost‐saving, productivity‐enhancing aid to earthwork operations. This paper contrasts the former methods for fine grading with the partially automated technology, describes the process of innovation for the advanced technology, compares this process with a model of innovation in the construction firm, and develops conclusions and practical applications based on this example of construction innovation.
    • Download: (1.148Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Partially Automated Grading: Construction Process Innovation

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/35508
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorC. B. Tatum
    contributor authorA. T. Funke
    date accessioned2017-05-08T21:01:01Z
    date available2017-05-08T21:01:01Z
    date copyrightMarch 1988
    date issued1988
    identifier other%28asce%290733-9364%281988%29114%3A1%2819%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/35508
    description abstractThe innovativeness of the construction industry has been both defended and debated. Innovative solutions to construction challenges have occurred, however, despite many hurdles. The partial automation of earthmoving equipment using laser‐guided controls, one such advancement, is the subject of this paper. This latest generation of a fragmented family of construction laser applications is a cost‐saving, productivity‐enhancing aid to earthwork operations. This paper contrasts the former methods for fine grading with the partially automated technology, describes the process of innovation for the advanced technology, compares this process with a model of innovation in the construction firm, and develops conclusions and practical applications based on this example of construction innovation.
    publisherAmerican Society of Civil Engineers
    titlePartially Automated Grading: Construction Process Innovation
    typeJournal Paper
    journal volume114
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1988)114:1(19)
    treeJournal of Construction Engineering and Management:;1988:;Volume ( 114 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian