YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Management Performance Under Dual Services Agreements

    Source: Journal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 004
    Author:
    C. E. Haltenhoff
    DOI: 10.1061/(ASCE)0733-9364(1987)113:4(640)
    Publisher: American Society of Civil Engineers
    Abstract: The standard documents of the American Institute of Architects and the Associated General Contractors of America for construction management projects imply processes and operational procedures that have become customary if not standard since publication in 1975. Adjustments must be made to accommodate the particular form and variation of construction management specifically required by the contract. However, construction management firms have a tendency to customize processes and procedures for their own convenience. This is especially true on projects where a firm is contractually assigned other service responsibilities such as design, contracting, or construction. When a CM process and its procedures exactly match the intent of the project delivery system, owners are positioned to gain from the use of the system. When convenience intervenes, the system cannot function effectively, and the owner may experience negative results. This paper argues that convenient customizing of the CM process and its procedures, especially customizing that mitigates the checks and balances specifically built into the construction management system and implied by established CM practice, represents a detrimental divergence from the fundamental reasons CM is. selected for use by owners on their projects.
    • Download: (554.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Construction Management Performance Under Dual Services Agreements

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/34064
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorC. E. Haltenhoff
    date accessioned2017-05-08T20:58:42Z
    date available2017-05-08T20:58:42Z
    date copyrightDecember 1987
    date issued1987
    identifier other%28asce%290733-9364%281987%29113%3A4%28640%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/34064
    description abstractThe standard documents of the American Institute of Architects and the Associated General Contractors of America for construction management projects imply processes and operational procedures that have become customary if not standard since publication in 1975. Adjustments must be made to accommodate the particular form and variation of construction management specifically required by the contract. However, construction management firms have a tendency to customize processes and procedures for their own convenience. This is especially true on projects where a firm is contractually assigned other service responsibilities such as design, contracting, or construction. When a CM process and its procedures exactly match the intent of the project delivery system, owners are positioned to gain from the use of the system. When convenience intervenes, the system cannot function effectively, and the owner may experience negative results. This paper argues that convenient customizing of the CM process and its procedures, especially customizing that mitigates the checks and balances specifically built into the construction management system and implied by established CM practice, represents a detrimental divergence from the fundamental reasons CM is. selected for use by owners on their projects.
    publisherAmerican Society of Civil Engineers
    titleConstruction Management Performance Under Dual Services Agreements
    typeJournal Paper
    journal volume113
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1987)113:4(640)
    treeJournal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian