YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Sources of Changes in Design–Build Contracts for a Governmental Owner

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 007
    Author:
    Robert A. Perkins
    DOI: 10.1061/(ASCE)0733-9364(2009)135:7(588)
    Publisher: American Society of Civil Engineers
    Abstract: In recent years, many U.S. federal, state, and local governments have been authorized to use the design–build method of project delivery instead of the traditional design–bid–build method. Recent studies have not been definitive on the cost advantage of design–build for governmental owners. There are fewer change orders in design–build due to design errors because the designer (architect/engineer) and contractor are one entity, but there are other causes of change orders. Some literature suggests that changes requested by the owner of the facility are greater with the design–build method. This research examines the causes for construction-phase changes in 14 design–build and 20 design–bid–build projects. Total changes, expressed as number per contract, cost per contract, or percentage of original contract, were significantly lower in design–build. Fewer design errors in design–build accounted for this advantage. The number of owner-requested changes was significantly greater in design–build. The cost of owner-requested changes, averaged over all the projects, was significantly less for design–bid–build. The differences in changes due to differing site conditions were not significant. The concept that there are more owner-requested changes in design–build projects is supported by this research.
    • Download: (209.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Sources of Changes in Design–Build Contracts for a Governmental Owner

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/29375
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRobert A. Perkins
    date accessioned2017-05-08T20:51:18Z
    date available2017-05-08T20:51:18Z
    date copyrightJuly 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A7%28588%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/29375
    description abstractIn recent years, many U.S. federal, state, and local governments have been authorized to use the design–build method of project delivery instead of the traditional design–bid–build method. Recent studies have not been definitive on the cost advantage of design–build for governmental owners. There are fewer change orders in design–build due to design errors because the designer (architect/engineer) and contractor are one entity, but there are other causes of change orders. Some literature suggests that changes requested by the owner of the facility are greater with the design–build method. This research examines the causes for construction-phase changes in 14 design–build and 20 design–bid–build projects. Total changes, expressed as number per contract, cost per contract, or percentage of original contract, were significantly lower in design–build. Fewer design errors in design–build accounted for this advantage. The number of owner-requested changes was significantly greater in design–build. The cost of owner-requested changes, averaged over all the projects, was significantly less for design–bid–build. The differences in changes due to differing site conditions were not significant. The concept that there are more owner-requested changes in design–build projects is supported by this research.
    publisherAmerican Society of Civil Engineers
    titleSources of Changes in Design–Build Contracts for a Governmental Owner
    typeJournal Paper
    journal volume135
    journal issue7
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:7(588)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 007
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian