YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 004
    Author:
    Stan J. Tuholski
    ,
    A. Petek Gursel
    ,
    Iris D. Tommelein
    ,
    Geoff Bomba
    DOI: 10.1061/(ASCE)0733-9364(2009)135:4(330)
    Publisher: American Society of Civil Engineers
    Abstract: This paper compares the delivery of two retrofit projects where seismic isolation bearings were installed. The comparison is retrospective. The design teams on these projects did not implement “lean” thinking to develop their approach, nevertheless, observed process differences are characterized using a “lean” process evaluation and optimization tool, and then gauged and rationalized from that perspective. Cross-functional process charts identify functional parties with interrelated material or information handoffs. They help to identify (un)necessary steps or complexity as measured by number of handoffs and interacting parties. Analysis of these charts shows that project value may stem from the owner integrating design development with product procurement and construction method selection. On one project, integration was made possible by structural engineers evaluating the impacts of product procurement on overall project performance, expert consultants providing construction process reviews, and experienced contractors participating in installation sequence development. This paper illustrates the value of developing a symbiotic relationship between designers and suppliers in a niche market. It stresses the need for work structuring early on in the delivery process, integrating process with product development, to improve project delivery.
    • Download: (1.067Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/29253
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorStan J. Tuholski
    contributor authorA. Petek Gursel
    contributor authorIris D. Tommelein
    contributor authorGeoff Bomba
    date accessioned2017-05-08T20:51:07Z
    date available2017-05-08T20:51:07Z
    date copyrightApril 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A4%28330%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/29253
    description abstractThis paper compares the delivery of two retrofit projects where seismic isolation bearings were installed. The comparison is retrospective. The design teams on these projects did not implement “lean” thinking to develop their approach, nevertheless, observed process differences are characterized using a “lean” process evaluation and optimization tool, and then gauged and rationalized from that perspective. Cross-functional process charts identify functional parties with interrelated material or information handoffs. They help to identify (un)necessary steps or complexity as measured by number of handoffs and interacting parties. Analysis of these charts shows that project value may stem from the owner integrating design development with product procurement and construction method selection. On one project, integration was made possible by structural engineers evaluating the impacts of product procurement on overall project performance, expert consultants providing construction process reviews, and experienced contractors participating in installation sequence development. This paper illustrates the value of developing a symbiotic relationship between designers and suppliers in a niche market. It stresses the need for work structuring early on in the delivery process, integrating process with product development, to improve project delivery.
    publisherAmerican Society of Civil Engineers
    title“Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects
    typeJournal Paper
    journal volume135
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:4(330)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian