YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Delivering Best Value in Highways Major Maintenance Schemes: Case Study

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 004
    Author:
    Mary Ansell
    ,
    Mike Holmes
    ,
    Rees Evans
    ,
    Christine Pasquire
    ,
    Andrew Price
    DOI: 10.1061/(ASCE)0733-9364(2009)135:4(235)
    Publisher: American Society of Civil Engineers
    Abstract: The Construction Management Framework (CMF) is a contract established by the Highways Agency in the United Kingdom, where collaborative working is used within a framework setting to deliver the best value in highways major renewals and improvements schemes. This research aims to establish the effectiveness of the CMF in achieving this aim. It aims to define best value as it is understood collectively by the participants in the framework, and evaluate the performance measurement used in terms of its relevance and suitability to deliver the best value. The research also looks at perceptions of the performance of the CMF by those companies included in the framework, and the benefits and disadvantages of using this type of arrangement in highway work. Data collected from the client were compared to that given by the contractors, supply chain, and construction managers of the CMF; results showed a perception by those involved in the framework that construction management is suited to the type of work it is currently used for, and there is potential for similar CMFs to be used elsewhere in the construction industry. However, the research also found that there is a need to improve the performance measures so that value is properly reflected in the goals of the CMF; and the presentation of evidence that demonstrates the benefits that can be gained using this procurement route.
    • Download: (1.155Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Delivering Best Value in Highways Major Maintenance Schemes: Case Study

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/29153
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMary Ansell
    contributor authorMike Holmes
    contributor authorRees Evans
    contributor authorChristine Pasquire
    contributor authorAndrew Price
    date accessioned2017-05-08T20:50:56Z
    date available2017-05-08T20:50:56Z
    date copyrightApril 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A4%28235%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/29153
    description abstractThe Construction Management Framework (CMF) is a contract established by the Highways Agency in the United Kingdom, where collaborative working is used within a framework setting to deliver the best value in highways major renewals and improvements schemes. This research aims to establish the effectiveness of the CMF in achieving this aim. It aims to define best value as it is understood collectively by the participants in the framework, and evaluate the performance measurement used in terms of its relevance and suitability to deliver the best value. The research also looks at perceptions of the performance of the CMF by those companies included in the framework, and the benefits and disadvantages of using this type of arrangement in highway work. Data collected from the client were compared to that given by the contractors, supply chain, and construction managers of the CMF; results showed a perception by those involved in the framework that construction management is suited to the type of work it is currently used for, and there is potential for similar CMFs to be used elsewhere in the construction industry. However, the research also found that there is a need to improve the performance measures so that value is properly reflected in the goals of the CMF; and the presentation of evidence that demonstrates the benefits that can be gained using this procurement route.
    publisherAmerican Society of Civil Engineers
    titleDelivering Best Value in Highways Major Maintenance Schemes: Case Study
    typeJournal Paper
    journal volume135
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:4(235)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian