| contributor author | Christian Stoy | |
| contributor author | Spiro Pollalis | |
| contributor author | Hans-Rudolf Schalcher | |
| date accessioned | 2017-05-08T20:48:06Z | |
| date available | 2017-05-08T20:48:06Z | |
| date copyright | January 2008 | |
| date issued | 2008 | |
| identifier other | %28asce%290733-9364%282008%29134%3A1%2832%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/27631 | |
| description abstract | This paper proposes the use of a series of independent variables for an early estimation of the building construction cost of residential buildings. Based on 70 German residential properties, these variables serve as the cost drivers of a project, and the regression model, tested against the 70 properties, has a mean absolute percentage error of 9.6%. When applied to predict the cost of five more properties that were excluded from the 70 in the regression model, the percentage error ranges between–12 and 13%. The identified cost drivers are: compactness of the building, number of elevators, size of the project, expected duration of construction, proportion of openings in external walls, and region. | |
| publisher | American Society of Civil Engineers | |
| title | Drivers for Cost Estimating in Early Design: Case Study of Residential Construction | |
| type | Journal Paper | |
| journal volume | 134 | |
| journal issue | 1 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2008)134:1(32) | |
| tree | Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 001 | |
| contenttype | Fulltext | |