Show simple item record

contributor authorKarim S. Karam
contributor authorJad S. Karam
contributor authorHerbert H. Einstein
date accessioned2017-05-08T20:47:12Z
date available2017-05-08T20:47:12Z
date copyrightMay 2007
date issued2007
identifier other%28asce%290733-9364%282007%29133%3A5%28354%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27131
description abstractTunnel exploration is a classic problem of decision making under uncertainty. This paper, Part II, dealing with the exploration problem, discusses the sources of uncertainty in tunnel exploration, and provides techniques to formally incorporate uncertainties into the exploration planning. Part I described the state of uncertainty in geology and exploration reliability using assigned probabilities. These probabilities are, however, uncertain. Construction costs are also uncertain. This paper presents tools with which the decision maker is able to assess the effects of these uncertainties on exploration decisions. Decisions are therefore made based on the value of collecting new, uncertain information through “virtual” exploration prior to actually exploring.
publisherAmerican Society of Civil Engineers
titleDecision Analysis Applied to Tunnel Exploration Planning. II: Consideration of Uncertainty
typeJournal Paper
journal volume133
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2007)133:5(354)
treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record