YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Probabilistic Control of Project Performance Using Control Limit Curves

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 012
    Author:
    Gabriel A. Barraza
    ,
    Rafael A. Bueno
    DOI: 10.1061/(ASCE)0733-9364(2007)133:12(957)
    Publisher: American Society of Civil Engineers
    Abstract: This study introduces a new probabilistic project control concept to assure an acceptable forecast of final project performance, in terms of not exceeding planned budget and schedule risk levels. This concept consists in the implementation of performance control limit curves for both actual cost and elapsed time, obtained with a probabilistic approach and a graphical representation referred to as Stochastic S curves (SS curves). In order to facilitate the project control process, control limit curves can be used to display and evaluate actual project performance status without the need of actualizing at completion performance forecasts. Three different approaches (quality, benchmarking, and incremental variance) are proposed in this paper for obtaining the project performance control limit curves. In order to find the control limit curve definition with more conservative acceptable performance variations, these approaches are tested in an example project. A further managerial advantage is found in the recommended approach, as it allows monitoring the use of both cost and scheduling contingencies, along the project execution.
    • Download: (658.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Probabilistic Control of Project Performance Using Control Limit Curves

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/26775
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorGabriel A. Barraza
    contributor authorRafael A. Bueno
    date accessioned2017-05-08T20:46:35Z
    date available2017-05-08T20:46:35Z
    date copyrightDecember 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A12%28957%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26775
    description abstractThis study introduces a new probabilistic project control concept to assure an acceptable forecast of final project performance, in terms of not exceeding planned budget and schedule risk levels. This concept consists in the implementation of performance control limit curves for both actual cost and elapsed time, obtained with a probabilistic approach and a graphical representation referred to as Stochastic S curves (SS curves). In order to facilitate the project control process, control limit curves can be used to display and evaluate actual project performance status without the need of actualizing at completion performance forecasts. Three different approaches (quality, benchmarking, and incremental variance) are proposed in this paper for obtaining the project performance control limit curves. In order to find the control limit curve definition with more conservative acceptable performance variations, these approaches are tested in an example project. A further managerial advantage is found in the recommended approach, as it allows monitoring the use of both cost and scheduling contingencies, along the project execution.
    publisherAmerican Society of Civil Engineers
    titleProbabilistic Control of Project Performance Using Control Limit Curves
    typeJournal Paper
    journal volume133
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:12(957)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian