YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Scheduling Construction Projects Using Evolutionary Algorithm

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 008
    Author:
    Piotr Jaśkowski
    ,
    Anna Sobotka
    DOI: 10.1061/(ASCE)0733-9364(2006)132:8(861)
    Publisher: American Society of Civil Engineers
    Abstract: This paper attempts to use evolutionary algorithms to solve the problem of minimizing construction project duration in deterministic conditions, with in-time changeable and limited accessibility of renewable resources (workforce, machines, and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed with different technological and organizational variants (different contractors, technologies, and ways of using resources). Such a description of realization conditions allows the method to also be applied to solving more complex problems that occur in construction practice (e.g., scheduling resources for a whole company, not only for a single project). The method’s versatility distinguishes it from other approaches presented in numerous publications. To assess the solutions generated by the evolutionary algorithm, the writers worked a heuristic algorithm (for the allocation of resources and the calculation of the shortest project duration). The results obtained by means of this methodology seem to be similar to outcomes of other comparable methodologies. The proposed methodology (the model and the computer system) may be of great significance to the construction industry. The paper contains some examples of the practical use of the evolutionary algorithm for project planning with time constraints.
    • Download: (538.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Scheduling Construction Projects Using Evolutionary Algorithm

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/26153
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorPiotr Jaśkowski
    contributor authorAnna Sobotka
    date accessioned2017-05-08T20:45:33Z
    date available2017-05-08T20:45:33Z
    date copyrightAugust 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A8%28861%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26153
    description abstractThis paper attempts to use evolutionary algorithms to solve the problem of minimizing construction project duration in deterministic conditions, with in-time changeable and limited accessibility of renewable resources (workforce, machines, and equipment). Particular construction processes (with various levels of complexity) must be conducted in the established technological order and can be executed with different technological and organizational variants (different contractors, technologies, and ways of using resources). Such a description of realization conditions allows the method to also be applied to solving more complex problems that occur in construction practice (e.g., scheduling resources for a whole company, not only for a single project). The method’s versatility distinguishes it from other approaches presented in numerous publications. To assess the solutions generated by the evolutionary algorithm, the writers worked a heuristic algorithm (for the allocation of resources and the calculation of the shortest project duration). The results obtained by means of this methodology seem to be similar to outcomes of other comparable methodologies. The proposed methodology (the model and the computer system) may be of great significance to the construction industry. The paper contains some examples of the practical use of the evolutionary algorithm for project planning with time constraints.
    publisherAmerican Society of Civil Engineers
    titleScheduling Construction Projects Using Evolutionary Algorithm
    typeJournal Paper
    journal volume132
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:8(861)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian