| contributor author | Marwa A. El Wardani | |
| contributor author | John I. Messner | |
| contributor author | Michael J. Horman | |
| date accessioned | 2017-05-08T20:44:15Z | |
| date available | 2017-05-08T20:44:15Z | |
| date copyright | March 2006 | |
| date issued | 2006 | |
| identifier other | %28asce%290733-9364%282006%29132%3A3%28230%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/25331 | |
| description abstract | The design-build delivery method is increasingly used in the United States due to numerous advantages it can offer a project. An important issue associated with design-build delivery is the procurement method used to select the design-build team. It is a critical decision that involves several key project team members, including the owner, designer, and contractor organizations, and requires the owner to carefully choose the design-build procurement method that will be used to select the team that will deliver the project. This research quantitatively analyzed the correlation between the design-build procurement method and the performance of the design-build project with regard to cost, time, and quality metrics. The procurement methods studied were sole source, qualifications-based, best value, and low bid selection. Data were collected through surveys from 76 design-build projects in the United States. Based on the patterns and relationships identified from these data, a better understanding of the procurement process and how it influences project performance is achieved. The impact of project-specific factors and guidelines are presented to assist owners in selecting the design-build team procurement method that responds to their project goals. | |
| publisher | American Society of Civil Engineers | |
| title | Comparing Procurement Methods for Design-Build Projects | |
| type | Journal Paper | |
| journal volume | 132 | |
| journal issue | 3 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2006)132:3(230) | |
| tree | Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 003 | |
| contenttype | Fulltext | |