YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Use of a WBS Matrix to Improve Interface Management in Projects

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 001
    Author:
    David K. Chua
    ,
    Myriam Godinot
    DOI: 10.1061/(ASCE)0733-9364(2006)132:1(67)
    Publisher: American Society of Civil Engineers
    Abstract: Many researchers agree that smoother construction would result from better communication between designers and constructors about specific requirements and constraints for construction that can be incorporated into the design. The same principle can be generalized to apply to all the phases of a construction project (design, equipment procurement, transport, delivery, installation, and testing, as well as hand-over activities), to the different partners (main contractors, subcontractors, and suppliers), and even internally to the teams working on different parts of a system for the same contractor. Specific requirements and constraints at work interfaces that are technical, organizational, temporal, and geographical in nature have to be made transparent so that they can be managed and resolved to avoid unnecessary reworks and delays. This paper proposes to use the work breakdown structure (WBS) concept to improve work interface management. In the manufacturing industry, the WBS concept is well exploited by crossing a horizontal breakdown of production activities with a vertical breakdown of final products, thus obtaining a WBS matrix, which is more complete and useful than the classical WBS tree. In this paper, the WBS and interface management concepts are first clarified. Then, it is proposed to transpose the WBS matrix concept into the construction industry and to analyze, in a case study, how it may be used to improve interface management. The case study involves the construction of a segment of a mass rapid transit system comprising many specialty trades spanning track works, power supply, signaling, passenger vehicles, and control.
    • Download: (1.786Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Use of a WBS Matrix to Improve Interface Management in Projects

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/24720
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid K. Chua
    contributor authorMyriam Godinot
    date accessioned2017-05-08T20:43:18Z
    date available2017-05-08T20:43:18Z
    date copyrightJanuary 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A1%2867%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24720
    description abstractMany researchers agree that smoother construction would result from better communication between designers and constructors about specific requirements and constraints for construction that can be incorporated into the design. The same principle can be generalized to apply to all the phases of a construction project (design, equipment procurement, transport, delivery, installation, and testing, as well as hand-over activities), to the different partners (main contractors, subcontractors, and suppliers), and even internally to the teams working on different parts of a system for the same contractor. Specific requirements and constraints at work interfaces that are technical, organizational, temporal, and geographical in nature have to be made transparent so that they can be managed and resolved to avoid unnecessary reworks and delays. This paper proposes to use the work breakdown structure (WBS) concept to improve work interface management. In the manufacturing industry, the WBS concept is well exploited by crossing a horizontal breakdown of production activities with a vertical breakdown of final products, thus obtaining a WBS matrix, which is more complete and useful than the classical WBS tree. In this paper, the WBS and interface management concepts are first clarified. Then, it is proposed to transpose the WBS matrix concept into the construction industry and to analyze, in a case study, how it may be used to improve interface management. The case study involves the construction of a segment of a mass rapid transit system comprising many specialty trades spanning track works, power supply, signaling, passenger vehicles, and control.
    publisherAmerican Society of Civil Engineers
    titleUse of a WBS Matrix to Improve Interface Management in Projects
    typeJournal Paper
    journal volume132
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:1(67)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian