YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 004
    Author:
    Nuno Gil
    ,
    Iris D. Tommelein
    ,
    Art Stout
    ,
    Thomas Garrett
    DOI: 10.1061/(ASCE)0733-9364(2005)131:4(439)
    Publisher: American Society of Civil Engineers
    Abstract: Four factors make it challenging to manage semiconductor fabrication facility (“fabs”) projects: technical complexity of the product design, need to compress the project duration, need to reduce upfront costs, and unexpected project changes. The strategies employed by practitioners to cope with these challenges form an intricate puzzle. We empirically develop a framework that provides a structure for helping to solve this puzzle, which comprises two principles: investing upfront in a flexible product design and structuring a flexible process. Empirical findings reveal that project teams make commitments early on by overdesigning but also postpone critical decisions by differentiating the scope of their work. Project teams employ other strategies such as increasing communication, using modular architectures, engaging in four-dimensional computer-based modeling, and fabricating components and subsystems off-site. Our analysis yields understanding on the purposes and performance tradeoffs of these strategies, and on how they embody the two principles. Project managers may find the framework useful when deciding which strategies best suit other equally challenging projects.
    • Download: (277.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/23843
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorNuno Gil
    contributor authorIris D. Tommelein
    contributor authorArt Stout
    contributor authorThomas Garrett
    date accessioned2017-05-08T20:41:52Z
    date available2017-05-08T20:41:52Z
    date copyrightApril 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A4%28439%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23843
    description abstractFour factors make it challenging to manage semiconductor fabrication facility (“fabs”) projects: technical complexity of the product design, need to compress the project duration, need to reduce upfront costs, and unexpected project changes. The strategies employed by practitioners to cope with these challenges form an intricate puzzle. We empirically develop a framework that provides a structure for helping to solve this puzzle, which comprises two principles: investing upfront in a flexible product design and structuring a flexible process. Empirical findings reveal that project teams make commitments early on by overdesigning but also postpone critical decisions by differentiating the scope of their work. Project teams employ other strategies such as increasing communication, using modular architectures, engaging in four-dimensional computer-based modeling, and fabricating components and subsystems off-site. Our analysis yields understanding on the purposes and performance tradeoffs of these strategies, and on how they embody the two principles. Project managers may find the framework useful when deciding which strategies best suit other equally challenging projects.
    publisherAmerican Society of Civil Engineers
    titleEmbodying Product and Process Flexibility to Cope with Challenging Project Deliveries
    typeJournal Paper
    journal volume131
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:4(439)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian