Design‐Basis Flood for Rehabilitation of Existing DamsSource: Journal of Hydraulic Engineering:;1992:;Volume ( 118 ):;issue: 002Author:Anand Prakash
DOI: 10.1061/(ASCE)0733-9429(1992)118:2(291)Publisher: American Society of Civil Engineers
Abstract: Rehabilitation of existing dams in a cost‐effective manner with due regard to hydrologic safety requires a rational method to determine the design‐basis flood (DBF). Four methods are presented to determine the DBF based on economic considerations alone. These include the expected damage, indemnification cost with and without price escalation, and modified expected damage approaches. The expected damage approach is presented to provide a basis for comparison with other approaches. One of the indemnification‐cost approaches includes no price escalation and the other provides for escalation of dollar‐denominated damages attributable to dam failure that is likely to occur in the future. The modified expected damage approach considers probabilities of flood damages during the life of the rehabilitated dam, rather than the absolute probabilities. In most cases, however, consideration of nondollar‐denominated consequences of rehabilitation are equally or more important. An approach based on a combination of the delphi and fuzzy‐set methods is presented to evaluate rehabilitation alternatives with different DBFs and select the most cost‐effective and acceptable DBF, based on both economic and nondollar‐denominated factors.
|
Collections
Show full item record
| contributor author | Anand Prakash | |
| date accessioned | 2017-05-08T20:41:23Z | |
| date available | 2017-05-08T20:41:23Z | |
| date copyright | February 1992 | |
| date issued | 1992 | |
| identifier other | %28asce%290733-9429%281992%29118%3A2%28291%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/23602 | |
| description abstract | Rehabilitation of existing dams in a cost‐effective manner with due regard to hydrologic safety requires a rational method to determine the design‐basis flood (DBF). Four methods are presented to determine the DBF based on economic considerations alone. These include the expected damage, indemnification cost with and without price escalation, and modified expected damage approaches. The expected damage approach is presented to provide a basis for comparison with other approaches. One of the indemnification‐cost approaches includes no price escalation and the other provides for escalation of dollar‐denominated damages attributable to dam failure that is likely to occur in the future. The modified expected damage approach considers probabilities of flood damages during the life of the rehabilitated dam, rather than the absolute probabilities. In most cases, however, consideration of nondollar‐denominated consequences of rehabilitation are equally or more important. An approach based on a combination of the delphi and fuzzy‐set methods is presented to evaluate rehabilitation alternatives with different DBFs and select the most cost‐effective and acceptable DBF, based on both economic and nondollar‐denominated factors. | |
| publisher | American Society of Civil Engineers | |
| title | Design‐Basis Flood for Rehabilitation of Existing Dams | |
| type | Journal Paper | |
| journal volume | 118 | |
| journal issue | 2 | |
| journal title | Journal of Hydraulic Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9429(1992)118:2(291) | |
| tree | Journal of Hydraulic Engineering:;1992:;Volume ( 118 ):;issue: 002 | |
| contenttype | Fulltext |