YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Automating Schedule Review for Expressway Construction

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 001
    Author:
    R. J. Dzeng
    ,
    H. P. Tserng
    ,
    W. C. Wang
    DOI: 10.1061/(ASCE)0733-9364(2005)131:1(127)
    Publisher: American Society of Civil Engineers
    Abstract: An expressway project is often divided into subprojects with different tendering packages, and carried out by several general contractors that apply different scheduling practices. Each schedule may contain hundreds of activities, each of which is associated with multiple pay items that determine its earned monetary value. With such huge amount of information, the reviewer can only check a sample piece of information, and the quality of review highly depends on the reviewer’s experience and devotion. Automated schedule review provides a solution to reduce such problems encountered in the industry. This paper presents a module-based schedule generation and review model, which includes a predefined set of network modules, network builder assistant computer system that helps schedulers manage and reuse the modules to build a new schedule, and another computer system network review assistant (NRA) that helps reviewers review schedules. The NRA uses generalized rule forms to represent the schedule critique knowledge collected from the industry. When potential errors are found, the NRA adopts case-based reasoning to suggest possible correction based on similar cases. The evaluation conducted by the practitioners using real projects indicates that NRA reduces review time, and provides more accurate review on finding activities and related pay items not conforming to standards, and reminding users of important but often omitted activities.
    • Download: (179.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Automating Schedule Review for Expressway Construction

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/22876
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorR. J. Dzeng
    contributor authorH. P. Tserng
    contributor authorW. C. Wang
    date accessioned2017-05-08T20:39:59Z
    date available2017-05-08T20:39:59Z
    date copyrightJanuary 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A1%28127%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22876
    description abstractAn expressway project is often divided into subprojects with different tendering packages, and carried out by several general contractors that apply different scheduling practices. Each schedule may contain hundreds of activities, each of which is associated with multiple pay items that determine its earned monetary value. With such huge amount of information, the reviewer can only check a sample piece of information, and the quality of review highly depends on the reviewer’s experience and devotion. Automated schedule review provides a solution to reduce such problems encountered in the industry. This paper presents a module-based schedule generation and review model, which includes a predefined set of network modules, network builder assistant computer system that helps schedulers manage and reuse the modules to build a new schedule, and another computer system network review assistant (NRA) that helps reviewers review schedules. The NRA uses generalized rule forms to represent the schedule critique knowledge collected from the industry. When potential errors are found, the NRA adopts case-based reasoning to suggest possible correction based on similar cases. The evaluation conducted by the practitioners using real projects indicates that NRA reduces review time, and provides more accurate review on finding activities and related pay items not conforming to standards, and reminding users of important but often omitted activities.
    publisherAmerican Society of Civil Engineers
    titleAutomating Schedule Review for Expressway Construction
    typeJournal Paper
    journal volume131
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:1(127)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian