YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 002
    Author:
    Ralph Barker
    ,
    Paul Childerhouse
    ,
    Mohamed Naim
    ,
    Jan Masat
    ,
    Derek Wilson
    DOI: 10.1061/(ASCE)0733-9364(2004)130:2(177)
    Publisher: American Society of Civil Engineers
    Abstract: Time compression is a widely accepted approach to improving customer service levels while minimizing total costs. However, few applications within the construction sector exist, especially in relation to the early stages of program development and design. These stages are of paramount importance because of the resultant ramifications on the total cycle time of the entire construction project, in the form of changes, rework, waste, and risk. Most applications of time compression focus on quantifying and removing nonvalue adding time from business processes. This is difficult for program development and the design stages of construction because most information sources are qualitative. As a result, a methodology has been developed to identify the key areas of potential improvement during these early stages. Collection of opinion data via semistructured interviews, questionnaires, and a workshop with a cross section of supply chain members has made it possible to quantify the potential improvements. The action research findings have been summarized into a time-compression model for the program development stages in the format of two interlinked cause and effect diagrams. These further emphasize the need for effective program development to minimize the risks of project overrun.
    • Download: (420.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Potential of Total Cycle Time Compression in Construction: Focus on Program Development and Design

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/21787
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRalph Barker
    contributor authorPaul Childerhouse
    contributor authorMohamed Naim
    contributor authorJan Masat
    contributor authorDerek Wilson
    date accessioned2017-05-08T20:37:56Z
    date available2017-05-08T20:37:56Z
    date copyrightApril 2004
    date issued2004
    identifier other%28asce%290733-9364%282004%29130%3A2%28177%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/21787
    description abstractTime compression is a widely accepted approach to improving customer service levels while minimizing total costs. However, few applications within the construction sector exist, especially in relation to the early stages of program development and design. These stages are of paramount importance because of the resultant ramifications on the total cycle time of the entire construction project, in the form of changes, rework, waste, and risk. Most applications of time compression focus on quantifying and removing nonvalue adding time from business processes. This is difficult for program development and the design stages of construction because most information sources are qualitative. As a result, a methodology has been developed to identify the key areas of potential improvement during these early stages. Collection of opinion data via semistructured interviews, questionnaires, and a workshop with a cross section of supply chain members has made it possible to quantify the potential improvements. The action research findings have been summarized into a time-compression model for the program development stages in the format of two interlinked cause and effect diagrams. These further emphasize the need for effective program development to minimize the risks of project overrun.
    publisherAmerican Society of Civil Engineers
    titlePotential of Total Cycle Time Compression in Construction: Focus on Program Development and Design
    typeJournal Paper
    journal volume130
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2004)130:2(177)
    treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian