ATSF 1980 El Dorado Line Change Failure/RehabilitationSource: Journal of Geotechnical Engineering:;1991:;Volume ( 117 ):;issue: 008Author:Gerald P. Raymond
DOI: 10.1061/(ASCE)0733-9410(1991)117:8(1191)Publisher: American Society of Civil Engineers
Abstract: Track support failure and rehabilitation of 14 km of railway mainline built in 1980 over a compacted clay (liquid limit 50‐70) is presented. The failed construction substituted a 300‐mm thick 5% lime stabilized layer for subballast. Ballast, 300‐mm thick below the tie base, supported prestressed concrete ties of similar design to those used in the Northeast Corridor reconstruction. Rehabilitation addressed the problems associated with subgrade pumping, track stiffness/softness, internal and external drainage, equivalent granular cover (total depth), and the compatibility of the ballast's toughness and mineral hardness in relation to the aggregate in the concrete ties. Reconstruction used inexpensive, locally available sand‐sized material for the subballast. A custom made geotextile was incorporated for extra safety. The rehabilitated track, carried out in 1984, has performed excellently.
|
Collections
Show full item record
| contributor author | Gerald P. Raymond | |
| date accessioned | 2017-05-08T20:36:08Z | |
| date available | 2017-05-08T20:36:08Z | |
| date copyright | August 1991 | |
| date issued | 1991 | |
| identifier other | %28asce%290733-9410%281991%29117%3A8%281191%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/20857 | |
| description abstract | Track support failure and rehabilitation of 14 km of railway mainline built in 1980 over a compacted clay (liquid limit 50‐70) is presented. The failed construction substituted a 300‐mm thick 5% lime stabilized layer for subballast. Ballast, 300‐mm thick below the tie base, supported prestressed concrete ties of similar design to those used in the Northeast Corridor reconstruction. Rehabilitation addressed the problems associated with subgrade pumping, track stiffness/softness, internal and external drainage, equivalent granular cover (total depth), and the compatibility of the ballast's toughness and mineral hardness in relation to the aggregate in the concrete ties. Reconstruction used inexpensive, locally available sand‐sized material for the subballast. A custom made geotextile was incorporated for extra safety. The rehabilitated track, carried out in 1984, has performed excellently. | |
| publisher | American Society of Civil Engineers | |
| title | ATSF 1980 El Dorado Line Change Failure/Rehabilitation | |
| type | Journal Paper | |
| journal volume | 117 | |
| journal issue | 8 | |
| journal title | Journal of Geotechnical Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9410(1991)117:8(1191) | |
| tree | Journal of Geotechnical Engineering:;1991:;Volume ( 117 ):;issue: 008 | |
| contenttype | Fulltext |