Deformational Control in Excavating Unstable SlopesSource: Journal of Geotechnical Engineering:;1987:;Volume ( 113 ):;issue: 004Author:Brian A. Chappell
DOI: 10.1061/(ASCE)0733-9410(1987)113:4(299)Publisher: American Society of Civil Engineers
Abstract: Rock bolting is not a commonly used tool for stabilizing rock slopes; however, its use in stabilizing large slopes in very poor rock is demonstrated here. During the excavation of double silos for a large pumped water storage hydroelectric scheme, multiple slope failures occur. Further excavation has been suspended until stabilization and excavation processes are determined. Extensive geological and numerical modeling, followed by sensitive monitoring with ongoing construction, is required. Deformations are predicted using a mechanistic finite element method. The installed monitoring system with predicted deformations is used to control construction and support requirements. If the measured deformations exceed the predicted deformations by more than 30% to 100%, depending on the class of rock, then reasons for these differences are determined before further excavations are performed.
|
Collections
Show full item record
| contributor author | Brian A. Chappell | |
| date accessioned | 2017-05-08T20:34:34Z | |
| date available | 2017-05-08T20:34:34Z | |
| date copyright | April 1987 | |
| date issued | 1987 | |
| identifier other | %28asce%290733-9410%281987%29113%3A4%28299%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/20058 | |
| description abstract | Rock bolting is not a commonly used tool for stabilizing rock slopes; however, its use in stabilizing large slopes in very poor rock is demonstrated here. During the excavation of double silos for a large pumped water storage hydroelectric scheme, multiple slope failures occur. Further excavation has been suspended until stabilization and excavation processes are determined. Extensive geological and numerical modeling, followed by sensitive monitoring with ongoing construction, is required. Deformations are predicted using a mechanistic finite element method. The installed monitoring system with predicted deformations is used to control construction and support requirements. If the measured deformations exceed the predicted deformations by more than 30% to 100%, depending on the class of rock, then reasons for these differences are determined before further excavations are performed. | |
| publisher | American Society of Civil Engineers | |
| title | Deformational Control in Excavating Unstable Slopes | |
| type | Journal Paper | |
| journal volume | 113 | |
| journal issue | 4 | |
| journal title | Journal of Geotechnical Engineering | |
| identifier doi | 10.1061/(ASCE)0733-9410(1987)113:4(299) | |
| tree | Journal of Geotechnical Engineering:;1987:;Volume ( 113 ):;issue: 004 | |
| contenttype | Fulltext |