YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Assignment and Allocation Optimization of Partially Multiskilled Workforce

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 002
    Author:
    Jorge E. Gomar
    ,
    Carl T. Haas
    ,
    David P. Morton
    DOI: 10.1061/(ASCE)0733-9364(2002)128:2(103)
    Publisher: American Society of Civil Engineers
    Abstract: Multiskilling is a workforce strategy that has been shown to reduce indirect labor costs, improve productivity, and reduce turnover. A multiskilled workforce is one in which the workers possess a range of skills that allow them to participate in more than one work process. In practice, they may work across craft boundaries. The success of multiskilling greatly relies on the foreman’s ability to assign workers to appropriate tasks and to compose crews effectively. The foreman assigns tasks to workers according to their knowledge, capabilities, and experience on former projects. This research investigated the mechanics of allocating a multiskilled workforce and developed a linear programming model to help optimize the multiskilled workforce assignment and allocation process in a construction project, or between the projects of one company. It is concluded that the model will be most useful in conditions where full employment does not exist; however, it is also useful for short term allocation decisions. By running the model for various simulated scenarios, additional observations were made. For example, it is concluded that, for a capital project, the benefits of multiskilling are marginal beyond approximately a 20% concentration of multiskilled workers in a project workforce. Benefits to workers themselves become marginal after acquiring competency in two or three crafts. These observations have been confirmed by field experience. Extension of this model to allocation of multifunctional resources, such as construction equipment, should also be possible.
    • Download: (493.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Assignment and Allocation Optimization of Partially Multiskilled Workforce

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/19887
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorJorge E. Gomar
    contributor authorCarl T. Haas
    contributor authorDavid P. Morton
    date accessioned2017-05-08T20:34:16Z
    date available2017-05-08T20:34:16Z
    date copyrightApril 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A2%28103%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19887
    description abstractMultiskilling is a workforce strategy that has been shown to reduce indirect labor costs, improve productivity, and reduce turnover. A multiskilled workforce is one in which the workers possess a range of skills that allow them to participate in more than one work process. In practice, they may work across craft boundaries. The success of multiskilling greatly relies on the foreman’s ability to assign workers to appropriate tasks and to compose crews effectively. The foreman assigns tasks to workers according to their knowledge, capabilities, and experience on former projects. This research investigated the mechanics of allocating a multiskilled workforce and developed a linear programming model to help optimize the multiskilled workforce assignment and allocation process in a construction project, or between the projects of one company. It is concluded that the model will be most useful in conditions where full employment does not exist; however, it is also useful for short term allocation decisions. By running the model for various simulated scenarios, additional observations were made. For example, it is concluded that, for a capital project, the benefits of multiskilling are marginal beyond approximately a 20% concentration of multiskilled workers in a project workforce. Benefits to workers themselves become marginal after acquiring competency in two or three crafts. These observations have been confirmed by field experience. Extension of this model to allocation of multifunctional resources, such as construction equipment, should also be possible.
    publisherAmerican Society of Civil Engineers
    titleAssignment and Allocation Optimization of Partially Multiskilled Workforce
    typeJournal Paper
    journal volume128
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:2(103)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian