YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 005
    Author:
    René A. Yamín
    ,
    David J. Harmelink
    DOI: 10.1061/(ASCE)0733-9364(2001)127:5(374)
    Publisher: American Society of Civil Engineers
    Abstract: Due to an increasingly competitive environment, construction companies are becoming more sophisticated, narrowing their focus, and becoming specialists in certain types of construction. This specialization requires more focused scheduling tools that prove to be better for certain type of projects. The critical path method (CPM) is the most utilized scheduling tool in the construction industry. However, for certain types of projects, CPM's usefulness decreases, because it becomes complex and difficult to use and understand. Alternative scheduling tools designed to be used with specific types of projects can prove to be more practical than CPM solutions. This paper provides a comparison of the CPM and a specialized tool, the linear scheduling model, by identifying critical attributes needed by any scheduling tool both at the higher management level and at the project level. Two project examples are scheduled with each method, and differences are discussed. Conclusions support that specialization of scheduling tools could be beneficial for the project manager and the project.
    • Download: (285.1Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/19510
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRené A. Yamín
    contributor authorDavid J. Harmelink
    date accessioned2017-05-08T20:33:30Z
    date available2017-05-08T20:33:30Z
    date copyrightOctober 2001
    date issued2001
    identifier other%28asce%290733-9364%282001%29127%3A5%28374%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19510
    description abstractDue to an increasingly competitive environment, construction companies are becoming more sophisticated, narrowing their focus, and becoming specialists in certain types of construction. This specialization requires more focused scheduling tools that prove to be better for certain type of projects. The critical path method (CPM) is the most utilized scheduling tool in the construction industry. However, for certain types of projects, CPM's usefulness decreases, because it becomes complex and difficult to use and understand. Alternative scheduling tools designed to be used with specific types of projects can prove to be more practical than CPM solutions. This paper provides a comparison of the CPM and a specialized tool, the linear scheduling model, by identifying critical attributes needed by any scheduling tool both at the higher management level and at the project level. Two project examples are scheduled with each method, and differences are discussed. Conclusions support that specialization of scheduling tools could be beneficial for the project manager and the project.
    publisherAmerican Society of Civil Engineers
    titleComparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
    typeJournal Paper
    journal volume127
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2001)127:5(374)
    treeJournal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian