YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Settlement‐Time Predictions in Preloading

    Source: Journal of Geotechnical Engineering:;1983:;Volume ( 109 ):;issue: 006
    Author:
    Aris C. Stamatopoulos
    ,
    Panaghiotis C. Kotzias
    DOI: 10.1061/(ASCE)0733-9410(1983)109:6(807)
    Publisher: American Society of Civil Engineers
    Abstract: Proper planning of preloading requires time predictions that cannot be obtained reliably from laboratory odometer tests. Time forecasts should be based on field permeability tests or test fills. The settlement versus log time curve of preloading can assume a variety of shapes, depending on the geometry and permeability of sand‐silt contained within the consolidating clay. Experience indicates that three types of curves are recurrent: (1) S‐shaped; (2) bilinear with increase in slope; and (3) linear. The first kind shows that settlement is about completed; for (2) and (3), approximate equations are proposed for predicting the settlement of the permanent structure from settlements observed during preloading. Examples are presented from two construction sites in Greece.
    • Download: (696.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Settlement‐Time Predictions in Preloading

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/19391
    Collections
    • Journal of Geotechnical Engineering

    Show full item record

    contributor authorAris C. Stamatopoulos
    contributor authorPanaghiotis C. Kotzias
    date accessioned2017-05-08T20:33:16Z
    date available2017-05-08T20:33:16Z
    date copyrightJune 1983
    date issued1983
    identifier other%28asce%290733-9410%281983%29109%3A6%28807%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/19391
    description abstractProper planning of preloading requires time predictions that cannot be obtained reliably from laboratory odometer tests. Time forecasts should be based on field permeability tests or test fills. The settlement versus log time curve of preloading can assume a variety of shapes, depending on the geometry and permeability of sand‐silt contained within the consolidating clay. Experience indicates that three types of curves are recurrent: (1) S‐shaped; (2) bilinear with increase in slope; and (3) linear. The first kind shows that settlement is about completed; for (2) and (3), approximate equations are proposed for predicting the settlement of the permanent structure from settlements observed during preloading. Examples are presented from two construction sites in Greece.
    publisherAmerican Society of Civil Engineers
    titleSettlement‐Time Predictions in Preloading
    typeJournal Paper
    journal volume109
    journal issue6
    journal titleJournal of Geotechnical Engineering
    identifier doi10.1061/(ASCE)0733-9410(1983)109:6(807)
    treeJournal of Geotechnical Engineering:;1983:;Volume ( 109 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian