| contributor author | Chaker, Mustapha | |
| contributor author | Meher | |
| contributor author | Pillai, Pradeep | |
| contributor author | Bhattacharya, Dipanjan | |
| contributor author | Messersmith, David | |
| date accessioned | 2017-05-09T01:17:45Z | |
| date available | 2017-05-09T01:17:45Z | |
| date issued | 2015 | |
| identifier issn | 1528-8919 | |
| identifier other | gtp_137_04_041702.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/157927 | |
| description abstract | This paper discusses complexities and challenges of managing boil off gas (BOG) in liquefied natural gas (LNG) liquefaction plants. Most publications in the past have focused on regasification terminals and have not addressed the area of liquefaction plants. The paper discusses the generation and management of BOG and the associated networks and machinery to manage it. BOG options available for both Greenfield plants and in debottlenecking situations are covered. The advantages and disadvantages of different options and compressor systems are covered and the concept of dynamic simulation as an analysis tool is addressed. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Application of Boil Off Gas Compressors in Liquefied Natural Gas Plants | |
| type | Journal Paper | |
| journal volume | 137 | |
| journal issue | 4 | |
| journal title | Journal of Engineering for Gas Turbines and Power | |
| identifier doi | 10.1115/1.4028576 | |
| journal fristpage | 41702 | |
| journal lastpage | 41702 | |
| identifier eissn | 0742-4795 | |
| tree | Journal of Engineering for Gas Turbines and Power:;2015:;volume( 137 ):;issue: 004 | |
| contenttype | Fulltext | |