YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Enhancing Oil Recovery With Bottom Water Drainage Completion

    Source: Journal of Energy Resources Technology:;2014:;volume( 136 ):;issue: 004::page 42906
    Author:
    Shirman, Ephim
    ,
    Wojtanowicz, Andrew K.
    ,
    Kurban, Hilal
    DOI: 10.1115/1.4028691
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Field trials and physical modeling of wells with downhole water sink (DWS) completions have demonstrated controlled water coning and increased oil production rate. However, no field trials were long enough to show DWS potential in improving of oil recovery in comparison with conventional wells. Presented here are theoretical and experimental results from a DWS recovery performance study. The recovery study involved experiments with a physical model and computer simulations. The experimental results reveal that DWS dramatically accelerates the recovery process; a fivefold increase of the oil production rate was reached by adjusting the water drainage rate at the bottom completion. The results also show a 70% increase of oil recovery; from 0.52 to 0.88 for conventional and DWS completions, respectively. The computersimulated experiments with commercial reservoir simulator demonstrate progressive improvement of recovery with downhole water drainage from 0.61 to 0.79 with no drainage and maximum drainage, respectively—a 24% increase of recovery factor, and a fivefold reduction of the time required to reach the limiting value of water cut, 0.98. However, the accelerated recovery process with DWS requires a substantial, up to 3.5fold, increase of total water production. The simulation experiments also show that the main advantage of using DWS is its flexibility in controlling the recovery process. For conventional completions, recovery could be slightly increased by reducing production rates and largely increasing production times. For DWS, a combination of the top and bottom rates could be optimized for maximum recovery and minimum production time.
    • Download: (1.871Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Enhancing Oil Recovery With Bottom Water Drainage Completion

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/154594
    Collections
    • Journal of Energy Resources Technology

    Show full item record

    contributor authorShirman, Ephim
    contributor authorWojtanowicz, Andrew K.
    contributor authorKurban, Hilal
    date accessioned2017-05-09T01:07:14Z
    date available2017-05-09T01:07:14Z
    date issued2014
    identifier issn0195-0738
    identifier otherjert_136_04_042906.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/154594
    description abstractField trials and physical modeling of wells with downhole water sink (DWS) completions have demonstrated controlled water coning and increased oil production rate. However, no field trials were long enough to show DWS potential in improving of oil recovery in comparison with conventional wells. Presented here are theoretical and experimental results from a DWS recovery performance study. The recovery study involved experiments with a physical model and computer simulations. The experimental results reveal that DWS dramatically accelerates the recovery process; a fivefold increase of the oil production rate was reached by adjusting the water drainage rate at the bottom completion. The results also show a 70% increase of oil recovery; from 0.52 to 0.88 for conventional and DWS completions, respectively. The computersimulated experiments with commercial reservoir simulator demonstrate progressive improvement of recovery with downhole water drainage from 0.61 to 0.79 with no drainage and maximum drainage, respectively—a 24% increase of recovery factor, and a fivefold reduction of the time required to reach the limiting value of water cut, 0.98. However, the accelerated recovery process with DWS requires a substantial, up to 3.5fold, increase of total water production. The simulation experiments also show that the main advantage of using DWS is its flexibility in controlling the recovery process. For conventional completions, recovery could be slightly increased by reducing production rates and largely increasing production times. For DWS, a combination of the top and bottom rates could be optimized for maximum recovery and minimum production time.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleEnhancing Oil Recovery With Bottom Water Drainage Completion
    typeJournal Paper
    journal volume136
    journal issue4
    journal titleJournal of Energy Resources Technology
    identifier doi10.1115/1.4028691
    journal fristpage42906
    journal lastpage42906
    identifier eissn1528-8994
    treeJournal of Energy Resources Technology:;2014:;volume( 136 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian