| contributor author | Luo, Shu | |
| contributor author | Kelkar, Mohan | |
| date accessioned | 2017-05-09T01:07:07Z | |
| date available | 2017-05-09T01:07:07Z | |
| date issued | 2014 | |
| identifier issn | 0195-0738 | |
| identifier other | jert_136_02_024501.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/154559 | |
| description abstract | Liquid loading is a common problem for most of the mature gas wells. Over years, many methods have been developed to solve this problem. One of the widely used methods is plunger lift, which requires shutin of the gas well for a period of time. Then, the well is reopened, and it is expected that the natural energy of the well will push the plunger to the surface carrying the liquid with it. Optimization of the plunger lift requires that the well be shutin for a period of time as short as possible, followed by production of gas for as long as possible. This note examines the requirement for a successful shutin of a well so that the well can sustain the production for a longer time. The note also discusses the condition under which the well will not sustain the production and the plunger lift will not be effective. The analysis is confirmed with several field examples, which will be shown in this note. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Effective Method to Predict Installation of Plunger in a Gas Well | |
| type | Journal Paper | |
| journal volume | 136 | |
| journal issue | 2 | |
| journal title | Journal of Energy Resources Technology | |
| identifier doi | 10.1115/1.4025799 | |
| journal fristpage | 24501 | |
| journal lastpage | 24501 | |
| identifier eissn | 1528-8994 | |
| tree | Journal of Energy Resources Technology:;2014:;volume( 136 ):;issue: 002 | |
| contenttype | Fulltext | |