Optimal Operation of a Gas Turbine Cogeneration Plant in Consideration of Equipment Minimum Up and Down TimesSource: Journal of Engineering for Gas Turbines and Power:;2013:;volume( 135 ):;issue: 007::page 71801Author:Yokoyama, Ryohei
DOI: 10.1115/1.4023615Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: It has become important for operators to determine operational strategies of energy supply plants appropriately corresponding to energy demands varying with season and time from the viewpoints of economics, energy saving, and reduction in CO2 emission. Especially, cogeneration plants produce heat and power simultaneously, which increases alternatives for operational strategies. This makes it more important for operators to determine operational strategies of cogeneration plants appropriately. In this paper, for the purpose of assisting operators or operating plants automatically, an optimal operational planning method based on the mixedinteger linear programming is developed to determine the operational strategy of equipment so as to minimize the operational cost, in consideration of equipment minimum up and down times for each piece of equipment to be operated with appropriate numbers of startups and shutdowns. In the numerical study, the proposed method is applied to the daily operational planning of a gas turbine cogeneration plant for district energy supply. It is clarified how the constraints for minimum up and down times affect the operational strategy and cost. Through the study, the validity and effectiveness of the proposed method is ascertained.
|
Show full item record
| contributor author | Yokoyama, Ryohei | |
| date accessioned | 2017-05-09T00:58:21Z | |
| date available | 2017-05-09T00:58:21Z | |
| date issued | 2013 | |
| identifier issn | 1528-8919 | |
| identifier other | gtp_135_7_071801.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/151647 | |
| description abstract | It has become important for operators to determine operational strategies of energy supply plants appropriately corresponding to energy demands varying with season and time from the viewpoints of economics, energy saving, and reduction in CO2 emission. Especially, cogeneration plants produce heat and power simultaneously, which increases alternatives for operational strategies. This makes it more important for operators to determine operational strategies of cogeneration plants appropriately. In this paper, for the purpose of assisting operators or operating plants automatically, an optimal operational planning method based on the mixedinteger linear programming is developed to determine the operational strategy of equipment so as to minimize the operational cost, in consideration of equipment minimum up and down times for each piece of equipment to be operated with appropriate numbers of startups and shutdowns. In the numerical study, the proposed method is applied to the daily operational planning of a gas turbine cogeneration plant for district energy supply. It is clarified how the constraints for minimum up and down times affect the operational strategy and cost. Through the study, the validity and effectiveness of the proposed method is ascertained. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Optimal Operation of a Gas Turbine Cogeneration Plant in Consideration of Equipment Minimum Up and Down Times | |
| type | Journal Paper | |
| journal volume | 135 | |
| journal issue | 7 | |
| journal title | Journal of Engineering for Gas Turbines and Power | |
| identifier doi | 10.1115/1.4023615 | |
| journal fristpage | 71801 | |
| journal lastpage | 71801 | |
| identifier eissn | 0742-4795 | |
| tree | Journal of Engineering for Gas Turbines and Power:;2013:;volume( 135 ):;issue: 007 | |
| contenttype | Fulltext |