Infill Drilling Potential in Tight Gas ReservoirsSource: Journal of Energy Resources Technology:;2013:;volume( 135 ):;issue: 001::page 13401DOI: 10.1115/1.4007662Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: Many operators of tight gas reservoir fields are interested in determining the infill well potential in these fields. Over drilling may prove to be uneconomical; whereas, under drilling would leave unexplored reserves under the ground. In predicting EUR (expected ultimate recovery) of a potential infill well, operators are interested in knowing what percentage of the production will be come from incremental reserves (newly accessed) and what percentage is from acceleration reserves (which can be produced from existing wells). So, higher the percentage of incremental reserves better is the potential of an infill well. In this paper, we present a novel method for determining the incremental versus acceleration potential for infill well in a tight gas reservoir. We evaluate the existing wells by plotting the data in a form so that the data can be linearly extrapolated. Then, we can predict the EUR for individual wells before and after new wells in the vicinity are drilled. By knowing how much gas is “diverted†from the older wells, we determine the acceleration component of an infill well. By repeating the process as the field is being developed, we can determine the fraction of acceleration and incremental components of the EUR at each stage of infill drilling. We will also know how the EUR is changing as the well spacing is slowly reduced. To ensure our results are reasonable, we also compare our EUR values with EUR’s reported by the operator as proved reserves. Armed with this information, we can extrapolate infill well potential for a smaller spacing, including the contribution due to acceleration versus incremental production. We applied this procedure for Wamsutter field in Wyoming. Using the procedure, we recommended infill well locations to the operator. Operator has drilled seven wells based on our recommendations. Using this new method, we can predict the EUR for infill well as well as acceleration and incremental contribution of the infill well. Thus, potential of infill wells at different locations can be evaluated and compared.
|
Collections
Show full item record
| contributor author | Luo, Shu | |
| contributor author | Kelkar, Mohan | |
| date accessioned | 2017-05-09T00:57:49Z | |
| date available | 2017-05-09T00:57:49Z | |
| date issued | 2013 | |
| identifier issn | 0195-0738 | |
| identifier other | jert_135_1_013401.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/151465 | |
| description abstract | Many operators of tight gas reservoir fields are interested in determining the infill well potential in these fields. Over drilling may prove to be uneconomical; whereas, under drilling would leave unexplored reserves under the ground. In predicting EUR (expected ultimate recovery) of a potential infill well, operators are interested in knowing what percentage of the production will be come from incremental reserves (newly accessed) and what percentage is from acceleration reserves (which can be produced from existing wells). So, higher the percentage of incremental reserves better is the potential of an infill well. In this paper, we present a novel method for determining the incremental versus acceleration potential for infill well in a tight gas reservoir. We evaluate the existing wells by plotting the data in a form so that the data can be linearly extrapolated. Then, we can predict the EUR for individual wells before and after new wells in the vicinity are drilled. By knowing how much gas is “diverted†from the older wells, we determine the acceleration component of an infill well. By repeating the process as the field is being developed, we can determine the fraction of acceleration and incremental components of the EUR at each stage of infill drilling. We will also know how the EUR is changing as the well spacing is slowly reduced. To ensure our results are reasonable, we also compare our EUR values with EUR’s reported by the operator as proved reserves. Armed with this information, we can extrapolate infill well potential for a smaller spacing, including the contribution due to acceleration versus incremental production. We applied this procedure for Wamsutter field in Wyoming. Using the procedure, we recommended infill well locations to the operator. Operator has drilled seven wells based on our recommendations. Using this new method, we can predict the EUR for infill well as well as acceleration and incremental contribution of the infill well. Thus, potential of infill wells at different locations can be evaluated and compared. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Infill Drilling Potential in Tight Gas Reservoirs | |
| type | Journal Paper | |
| journal volume | 135 | |
| journal issue | 1 | |
| journal title | Journal of Energy Resources Technology | |
| identifier doi | 10.1115/1.4007662 | |
| journal fristpage | 13401 | |
| journal lastpage | 13401 | |
| identifier eissn | 1528-8994 | |
| tree | Journal of Energy Resources Technology:;2013:;volume( 135 ):;issue: 001 | |
| contenttype | Fulltext |