YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Maximization of the Profit of a Complex Combined-Cycle Cogeneration Plant Using a Professional Process Simulator

    Source: Journal of Engineering for Gas Turbines and Power:;2010:;volume( 132 ):;issue: 004::page 41801
    Author:
    Leonardo S. Vieira
    ,
    Carlos F. Matt
    ,
    Vanessa G. Guedes
    ,
    Manuel E. Cruz
    ,
    Fernando V. Castellões
    DOI: 10.1115/1.3204506
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The high cost of energy resources has driven a strong and continued quest for their optimal utilization. In this context, modern thermoeconomic optimization techniques have been developed to analyze and design improved energy systems, leading to a better compromise between energetic efficiency and cost. Thermoeconomic optimization can be parametric (plant configuration is fixed), applicable both at the design phase or operation phase of a system, or structural (plant configuration may vary). In practice, mathematical thermoeconomic optimization may be accomplished in two ways: (i) the conventional way, which manipulates all pertinent equations simultaneously or (ii) integrated with a professional process simulator, such that the equations are manipulated separately. In the latter case, the simulator deals with the thermodynamic property and balance equations, while an external optimization routine, linked to the simulator, deals with the economic equations and objective function. In this work, a previous implementation of an integrated approach for parametric mathematical thermoeconomic optimization of complex thermal systems is applied to an actual combined-cycle cogeneration plant located in the outskirts of the city of Rio de Janeiro in Brazil. The plant contains more than 60 thermal components, including two gas turbines, one steam turbine, and two heat recovery steam generators. Several hundred variables are required to simulate the plant at one operational steady-state. The plant produces 380 MW of power nominally, and exports a mass flow rate between 200 tons/h and 400 tons/h of superheated process steam, at 45 bars and 404°C, to a neighboring refinery. The simulator is the THERMOFLEX software, which interfaces with the Microsoft Excel program. The optimization routine is written in the Visual Basic for Applications language and is based on Powell’s method. The cogeneration plant operates subjected to time-changing economic scenarios, because of varying fuel, electricity, and steam prices. Thus, to manage the plant, it is necessary to vary the operational state appropriately as the economic parameters change. For a prescribed economic scenario, previous work determined the minimum operational cost, when a fixed contracted hourly-rate of process steam was to be exported, while a variable amount of electrical power was produced. In this paper, a broader optimization problem is formulated and solved, for which the objective is to maximize the plant profit under different economic scenarios. It is shown that the optimal operating conditions depend on the economic parameters, and do not necessarily imply maximum efficiency. The integrated optimization approach proves effective, robust, and helpful for optimal plant management.
    keyword(s): Design , Optimization , Flow (Dynamics) , Industrial plants , Steam , Combined heat and power , Cycles AND Fuels ,
    • Download: (317.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Maximization of the Profit of a Complex Combined-Cycle Cogeneration Plant Using a Professional Process Simulator

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/143227
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorLeonardo S. Vieira
    contributor authorCarlos F. Matt
    contributor authorVanessa G. Guedes
    contributor authorManuel E. Cruz
    contributor authorFernando V. Castellões
    date accessioned2017-05-09T00:37:47Z
    date available2017-05-09T00:37:47Z
    date copyrightApril, 2010
    date issued2010
    identifier issn1528-8919
    identifier otherJETPEZ-27107#041801_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/143227
    description abstractThe high cost of energy resources has driven a strong and continued quest for their optimal utilization. In this context, modern thermoeconomic optimization techniques have been developed to analyze and design improved energy systems, leading to a better compromise between energetic efficiency and cost. Thermoeconomic optimization can be parametric (plant configuration is fixed), applicable both at the design phase or operation phase of a system, or structural (plant configuration may vary). In practice, mathematical thermoeconomic optimization may be accomplished in two ways: (i) the conventional way, which manipulates all pertinent equations simultaneously or (ii) integrated with a professional process simulator, such that the equations are manipulated separately. In the latter case, the simulator deals with the thermodynamic property and balance equations, while an external optimization routine, linked to the simulator, deals with the economic equations and objective function. In this work, a previous implementation of an integrated approach for parametric mathematical thermoeconomic optimization of complex thermal systems is applied to an actual combined-cycle cogeneration plant located in the outskirts of the city of Rio de Janeiro in Brazil. The plant contains more than 60 thermal components, including two gas turbines, one steam turbine, and two heat recovery steam generators. Several hundred variables are required to simulate the plant at one operational steady-state. The plant produces 380 MW of power nominally, and exports a mass flow rate between 200 tons/h and 400 tons/h of superheated process steam, at 45 bars and 404°C, to a neighboring refinery. The simulator is the THERMOFLEX software, which interfaces with the Microsoft Excel program. The optimization routine is written in the Visual Basic for Applications language and is based on Powell’s method. The cogeneration plant operates subjected to time-changing economic scenarios, because of varying fuel, electricity, and steam prices. Thus, to manage the plant, it is necessary to vary the operational state appropriately as the economic parameters change. For a prescribed economic scenario, previous work determined the minimum operational cost, when a fixed contracted hourly-rate of process steam was to be exported, while a variable amount of electrical power was produced. In this paper, a broader optimization problem is formulated and solved, for which the objective is to maximize the plant profit under different economic scenarios. It is shown that the optimal operating conditions depend on the economic parameters, and do not necessarily imply maximum efficiency. The integrated optimization approach proves effective, robust, and helpful for optimal plant management.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleMaximization of the Profit of a Complex Combined-Cycle Cogeneration Plant Using a Professional Process Simulator
    typeJournal Paper
    journal volume132
    journal issue4
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.3204506
    journal fristpage41801
    identifier eissn0742-4795
    keywordsDesign
    keywordsOptimization
    keywordsFlow (Dynamics)
    keywordsIndustrial plants
    keywordsSteam
    keywordsCombined heat and power
    keywordsCycles AND Fuels
    treeJournal of Engineering for Gas Turbines and Power:;2010:;volume( 132 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian