YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling

    Source: Journal of Engineering for Gas Turbines and Power:;2006:;volume( 128 ):;issue: 004::page 796
    Author:
    Yongjun Zhao
    ,
    Vitali Volovoi
    ,
    Mark Waters
    ,
    Dimitri Mavris
    DOI: 10.1115/1.2179470
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Traditionally, gas turbine power plant preventive maintenance schedules are set with constant intervals based on recommendations from the equipment suppliers. Preventive maintenance is based on fleet-wide experience as a guideline as long as individual unit experience is not available. In reality, the operating conditions for each gas turbine may vary from site to site and from unit to unit. Furthermore, the gas turbine is a repairable deteriorating system, and preventive maintenance usually restores only part of its performance. This suggests a gas turbine needs more frequent inspection and maintenance as it ages. A unit-specific sequential preventive maintenance approach is therefore needed for gas turbine power plant preventive maintenance scheduling. Traditionally, the optimization criteria for preventive maintenance scheduling is usually cost based. However, in the deregulated electric power market, a profit-based optimization approach is expected to be more effective than the cost-based approach. In such an approach, power plant performance, reliability, and the market dynamics are considered in a joint fashion. In this paper, a novel idea that economic factors drive maintenance frequency and expense to more frequent repairs and greater expense as equipment ages is introduced, and a profit-based unit-specific sequential preventive maintenance scheduling methodology is developed. To demonstrate the feasibility of the proposed approach, a conceptual level study is performed using a base load combined cycle power plant with a single gas turbine unit.
    keyword(s): Maintenance , Power stations AND Gas turbines ,
    • Download: (238.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/133628
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorYongjun Zhao
    contributor authorVitali Volovoi
    contributor authorMark Waters
    contributor authorDimitri Mavris
    date accessioned2017-05-09T00:19:45Z
    date available2017-05-09T00:19:45Z
    date copyrightOctober, 2006
    date issued2006
    identifier issn1528-8919
    identifier otherJETPEZ-26926#796_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/133628
    description abstractTraditionally, gas turbine power plant preventive maintenance schedules are set with constant intervals based on recommendations from the equipment suppliers. Preventive maintenance is based on fleet-wide experience as a guideline as long as individual unit experience is not available. In reality, the operating conditions for each gas turbine may vary from site to site and from unit to unit. Furthermore, the gas turbine is a repairable deteriorating system, and preventive maintenance usually restores only part of its performance. This suggests a gas turbine needs more frequent inspection and maintenance as it ages. A unit-specific sequential preventive maintenance approach is therefore needed for gas turbine power plant preventive maintenance scheduling. Traditionally, the optimization criteria for preventive maintenance scheduling is usually cost based. However, in the deregulated electric power market, a profit-based optimization approach is expected to be more effective than the cost-based approach. In such an approach, power plant performance, reliability, and the market dynamics are considered in a joint fashion. In this paper, a novel idea that economic factors drive maintenance frequency and expense to more frequent repairs and greater expense as equipment ages is introduced, and a profit-based unit-specific sequential preventive maintenance scheduling methodology is developed. To demonstrate the feasibility of the proposed approach, a conceptual level study is performed using a base load combined cycle power plant with a single gas turbine unit.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleA Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling
    typeJournal Paper
    journal volume128
    journal issue4
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.2179470
    journal fristpage796
    journal lastpage805
    identifier eissn0742-4795
    keywordsMaintenance
    keywordsPower stations AND Gas turbines
    treeJournal of Engineering for Gas Turbines and Power:;2006:;volume( 128 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian