YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Engineering for Gas Turbines and Power
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Energy Recovery of Blast-Furnace Gas Coke: The Importance of a Correct Regulation System

    Source: Journal of Engineering for Gas Turbines and Power:;1996:;volume( 118 ):;issue: 003::page 610
    Author:
    D. Laforgia
    ,
    F. Ruggiero
    DOI: 10.1115/1.2816692
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The present work deals with the regulation system of a plant recovering the energy of blast-furnace gas coke residual pressure. Such a plant is equipped with a turbogenerator, which produces electric energy, expanding the gas coke up to the mill pipe network pressure value. Before revamping, the regulation system consisted of an automatic nozzle control of a turbine stator and a throttle valve. Once the system became operative, the regulation system seemed to be inadequate because it caused a significant reduction in energy recovery due to the variation of the gas coke characteristics, compared to the original engineering specifications. A mathematical model for the plant simulation has been developed through the regulation system static and dynamic responses. This simulation, together with a series of experimental tests, identified the causes of the operational problems in the original regulation system. On the basis of the response times of the old regulation system, a value with reduced intervention inertia has been suggested. The regulation logic was also modified: The valve interventions were directly linked to the pressure variations recorded at the blast furnace top, and no longer to the opening variation of the turbine automatic system. A more rational use of the plant components and its control system, together with an increase of the electric energy production, have been demonstrated.
    keyword(s): Blast furnaces , Coke , Energy recovery , Industrial plants , Pressure , Simulation , Turbines , Valves , Dynamic response , Networks , Stators , Inertia (Mechanics) , Energy generation , Nozzles , Pipes , Control systems AND Turbogenerators ,
    • Download: (866.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      Energy Recovery of Blast-Furnace Gas Coke: The Importance of a Correct Regulation System

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/116914
    Collections
    • Journal of Engineering for Gas Turbines and Power

    Show full item record

    contributor authorD. Laforgia
    contributor authorF. Ruggiero
    date accessioned2017-05-08T23:50:05Z
    date available2017-05-08T23:50:05Z
    date copyrightJuly, 1996
    date issued1996
    identifier issn1528-8919
    identifier otherJETPEZ-26756#610_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/116914
    description abstractThe present work deals with the regulation system of a plant recovering the energy of blast-furnace gas coke residual pressure. Such a plant is equipped with a turbogenerator, which produces electric energy, expanding the gas coke up to the mill pipe network pressure value. Before revamping, the regulation system consisted of an automatic nozzle control of a turbine stator and a throttle valve. Once the system became operative, the regulation system seemed to be inadequate because it caused a significant reduction in energy recovery due to the variation of the gas coke characteristics, compared to the original engineering specifications. A mathematical model for the plant simulation has been developed through the regulation system static and dynamic responses. This simulation, together with a series of experimental tests, identified the causes of the operational problems in the original regulation system. On the basis of the response times of the old regulation system, a value with reduced intervention inertia has been suggested. The regulation logic was also modified: The valve interventions were directly linked to the pressure variations recorded at the blast furnace top, and no longer to the opening variation of the turbine automatic system. A more rational use of the plant components and its control system, together with an increase of the electric energy production, have been demonstrated.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleEnergy Recovery of Blast-Furnace Gas Coke: The Importance of a Correct Regulation System
    typeJournal Paper
    journal volume118
    journal issue3
    journal titleJournal of Engineering for Gas Turbines and Power
    identifier doi10.1115/1.2816692
    journal fristpage610
    journal lastpage619
    identifier eissn0742-4795
    keywordsBlast furnaces
    keywordsCoke
    keywordsEnergy recovery
    keywordsIndustrial plants
    keywordsPressure
    keywordsSimulation
    keywordsTurbines
    keywordsValves
    keywordsDynamic response
    keywordsNetworks
    keywordsStators
    keywordsInertia (Mechanics)
    keywordsEnergy generation
    keywordsNozzles
    keywordsPipes
    keywordsControl systems AND Turbogenerators
    treeJournal of Engineering for Gas Turbines and Power:;1996:;volume( 118 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian