YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    The Non-Nuclear Conversion of the Montalto BWR/6-Mark III Plant: A Technical and Economical Assessment of the Proposed Options

    Source: Journal of Energy Resources Technology:;1989:;volume( 111 ):;issue: 002::page 77
    Author:
    Enrico Sciubba
    DOI: 10.1115/1.3231409
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The 2×981 MW, GE-BWR/6-Mark III Montalto plant was commissioned in the late 1970s by the Italian Public Utility (ENEL), in a context—the “Nuclear Option Plan,” “PUN”1 —which called for the construction of about 10 nuclear powerplants of various types in several sites across Italy, to cover approximately a 15 percent share of the baseload requirements by the year 2000. For several reasons, both technical and political, the ambitious PUN failed, to a point in which, following a National Conference on Energy Generation Systems and Strategies (Feb. 1987), the citizens were called to decide in a national ballot whether they wanted such a plan to be discontinued or enforced (Nov. 1987). The decision having been to discontinue the PUN (by a 66-percent to 34-percent margin), the problem arose about the destination of the two plants which were under construction: “Trino 2”—midway between Torino (Turin) and Milano (Milan)—and “Montalto”—about 70-km from Roma (Rome). Trino, being in the initial construction stages, was promptly halted. The decision about Montalto (70 percent completed) was a more difficult one. Six alternatives were formally presented to a specially appointed Government Committee: (i) the original nuclear option as envisioned by the PUN; (ii) and (iii) two different reconversions to a gas-fired, combined cycle plant, both of which have been proposed earlier (1986) on the basis of objections to the safety procedures related to the reactor’s operation; (iv) a substitution with a series of 7 modular, gas-fired combined cycle plants (also proposed before the national ballot); (v) a reconversion to a multi-fuel, custom-design steam powerplant (also proposed before the national ballot); (vi) a substitution with four modular units, each standard steam multi-fuel (proposed by the Public Utility as the only valid alternative to the completion of the nuclear plant). This paper presents an independent, comparative analysis of the six alternatives, taking into account both technical and economical issues. On the basis of a cost structure deduced by the Public Utility’s published data, an average cost for the kilowatthour is determined for each of the six options, and compared to that corresponding to the completion of the nuclear plant. The final decision of the Italian Government was made public in June 1988 and is also discussed in this final version of the paper.
    keyword(s): Industrial plants , Boiling water reactors , Nuclear power stations , Construction , Fuels , Cycles , Public utilities , Governments , Safety , Design , Energy / power systems , Steam AND Thermal power stations ,
    • Download: (1.133Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Statistics

      The Non-Nuclear Conversion of the Montalto BWR/6-Mark III Plant: A Technical and Economical Assessment of the Proposed Options

    URI
    https://yetl.yabesh.ir/yetl1/handle/yetl/105313
    Collections
    • Journal of Energy Resources Technology

    Show full item record

    contributor authorEnrico Sciubba
    date accessioned2017-05-08T23:29:49Z
    date available2017-05-08T23:29:49Z
    date copyrightJune, 1989
    date issued1989
    identifier issn0195-0738
    identifier otherJERTD2-26427#77_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/105313
    description abstractThe 2×981 MW, GE-BWR/6-Mark III Montalto plant was commissioned in the late 1970s by the Italian Public Utility (ENEL), in a context—the “Nuclear Option Plan,” “PUN”1 —which called for the construction of about 10 nuclear powerplants of various types in several sites across Italy, to cover approximately a 15 percent share of the baseload requirements by the year 2000. For several reasons, both technical and political, the ambitious PUN failed, to a point in which, following a National Conference on Energy Generation Systems and Strategies (Feb. 1987), the citizens were called to decide in a national ballot whether they wanted such a plan to be discontinued or enforced (Nov. 1987). The decision having been to discontinue the PUN (by a 66-percent to 34-percent margin), the problem arose about the destination of the two plants which were under construction: “Trino 2”—midway between Torino (Turin) and Milano (Milan)—and “Montalto”—about 70-km from Roma (Rome). Trino, being in the initial construction stages, was promptly halted. The decision about Montalto (70 percent completed) was a more difficult one. Six alternatives were formally presented to a specially appointed Government Committee: (i) the original nuclear option as envisioned by the PUN; (ii) and (iii) two different reconversions to a gas-fired, combined cycle plant, both of which have been proposed earlier (1986) on the basis of objections to the safety procedures related to the reactor’s operation; (iv) a substitution with a series of 7 modular, gas-fired combined cycle plants (also proposed before the national ballot); (v) a reconversion to a multi-fuel, custom-design steam powerplant (also proposed before the national ballot); (vi) a substitution with four modular units, each standard steam multi-fuel (proposed by the Public Utility as the only valid alternative to the completion of the nuclear plant). This paper presents an independent, comparative analysis of the six alternatives, taking into account both technical and economical issues. On the basis of a cost structure deduced by the Public Utility’s published data, an average cost for the kilowatthour is determined for each of the six options, and compared to that corresponding to the completion of the nuclear plant. The final decision of the Italian Government was made public in June 1988 and is also discussed in this final version of the paper.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleThe Non-Nuclear Conversion of the Montalto BWR/6-Mark III Plant: A Technical and Economical Assessment of the Proposed Options
    typeJournal Paper
    journal volume111
    journal issue2
    journal titleJournal of Energy Resources Technology
    identifier doi10.1115/1.3231409
    journal fristpage77
    journal lastpage89
    identifier eissn1528-8994
    keywordsIndustrial plants
    keywordsBoiling water reactors
    keywordsNuclear power stations
    keywordsConstruction
    keywordsFuels
    keywordsCycles
    keywordsPublic utilities
    keywordsGovernments
    keywordsSafety
    keywordsDesign
    keywordsEnergy / power systems
    keywordsSteam AND Thermal power stations
    treeJournal of Energy Resources Technology:;1989:;volume( 111 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian