YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 15

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Health Assessment and Maintenance Strategy for Bridge Management Systems: Lessons Learned in Taiwan 

    Source: Journal of Infrastructure Systems:;2007:;Volume ( 013 ):;issue: 003
    Author(s): H. Ping Tserng; Chin-Lung Chung
    Publisher: American Society of Civil Engineers
    Abstract: Usually the rating values are determined by visual inspection in most of the bridge management systems (BMSs). A visual inspection is not very objective, and can sometimes result in a different assessment of element condition ...
    Request PDF

    Object-Oriented Scheduling for Repetitive Projects with Soft Logics 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 001
    Author(s): Su-Ling Fan; H. P. Tserng
    Publisher: American Society of Civil Engineers
    Abstract: The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require ...
    Request PDF

    Maintenance Strategy for Bridge Components on the Basis of Performance 

    Source: Journal of Performance of Constructed Facilities:;2009:;Volume ( 023 ):;issue: 004
    Author(s): H. Ping Tserng; Samuel Yen-Liang Yin; Chin-Lung Chung
    Publisher: American Society of Civil Engineers
    Abstract: Usually the status of a bridge is determined by its structural capability and material strength. Consequently a lot of researchers have studied the failure, the fatigue, and the deterioration of the structure in terms of ...
    Request PDF

    Closure to “Developing a Resource Supply Chain Planning System for Construction Projects” by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 005
    Author(s): H. Ping Tserng; Samuel Y. Yin; Sherman H. Li
    Publisher: American Society of Civil Engineers
    Request PDF

    Developing a Resource Supply Chain Planning System for Construction Projects 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 004
    Author(s): H. Ping Tserng; Samuel Y. L. Yin; Sherman Li
    Publisher: American Society of Civil Engineers
    Abstract: The high variability of construction environments results in high construction-cost variation, especially in material costs. Inadequate planning may cause material shortages that delay the project schedule or, alternatively, ...
    Request PDF

    Module-Based Construction Schedule Administration for Public Infrastructure Agencies 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001
    Author(s): R. J. Dzeng; W. C. Wang; H. P. Tserng
    Publisher: American Society of Civil Engineers
    Abstract: Infrastructure projects such as the construction of expressways are often distributed over different regions and must therefore be divided into several tendering packages. The public agencies that administrate such projects ...
    Request PDF

    Automating Schedule Review for Expressway Construction 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 001
    Author(s): R. J. Dzeng; H. P. Tserng; W. C. Wang
    Publisher: American Society of Civil Engineers
    Abstract: An expressway project is often divided into subprojects with different tendering packages, and carried out by several general contractors that apply different scheduling practices. Each schedule may contain hundreds of ...
    Request PDF

    A Contingency Model of Strategic Responses to the Institutional Challenges in Emerging Countries: Evidence and Findings from Least Developed Countries 

    Source: Journal of Management in Engineering:;2023:;Volume ( 039 ):;issue: 004:;page 04023015-1
    Author(s): S. Ping Ho; Rameshwar Dahal; Hui-Ping Tserng
    Publisher: American Society of Civil Engineers
    Abstract: The infrastructure development of emerging economies forms new market opportunities with great potential for multinational firms. However, international contractors are faced with extraordinary institutional challenges ...
    Request PDF

    Exploring the Effectiveness of Chinese-to-English Machine Translation for CLIR Applications in Earthquake Engineering 

    Source: Journal of Computing in Civil Engineering:;2009:;Volume ( 023 ):;issue: 003
    Author(s): K. Y. Lin; K. W. Chou; H. T. Lin; S. H. Hsieh; H. P. Tserng
    Publisher: American Society of Civil Engineers
    Abstract: Machine translation is able to support cross-language information retrieval (CLIR) applications given the availability of high-quality translation resources. This study explores the effectiveness of machine translation for ...
    Request PDF

    GPS-Based Real-Time Guidance Information System for Marine Pier Construction 

    Source: Journal of Surveying Engineering:;2013:;Volume ( 139 ):;issue: 002
    Author(s): Hui-Ping; Tserng; Jen-Yu; Han; Chih-Ting; Lin; Mirosław; Skibniewski; Kai-Wei; Weng
    Publisher: American Society of Civil Engineers
    Abstract: Pile positioning, for driving piles below the surface of water in a marine pier construction project, is typically a time-consuming task owing to the fact that the pile wharf is affected significantly by environmental ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian