YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 15

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    A Journal Matures 

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 009
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: In the mid-1970s the
    Request PDF

    Cost‐Estimating Principles 

    Source: Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 004
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: Estimates of materials, time, and costs provide information to some construction decisions in a similar way that financial accounting information provides to others. Financial statements are required to comply with generally ...
    Request PDF

    Optimum Markup by Direct Solution 

    Source: Journal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 001
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: A direct solution technique determines optimum markup for competitive construction bids using either lowest opposing bid models or average opposing bid models. A graphical representation helps explain the technique. Lowest ...
    Request PDF

    Competitive Bidding and Opportunity Costs 

    Source: Journal of Construction Engineering and Management:;1987:;Volume ( 113 ):;issue: 001
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: Methods of analyzing competitive bidding have treated construction projects as isolated elements to be optimized without regard to availability of work or other opportunity costs. This paper shows how resource restraints ...
    Request PDF

    Cost, Schedule, and Time Variances and Integration 

    Source: Journal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 002
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: This paper demonstrates detailed schedule‐ and cost‐control relationships at the activity/cost‐account level using generic microcomputer software to budget, track, and control projects. Time variances are introduced to ...
    Request PDF

    Engineering and Construction Management: Leadership and Opportunity 

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 003
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: Construction engineering and management (CE&M) is successful, and it continues to grow and evolve. The construction industry is working hard to improve and CE&M is a leader in that effort. There is much still to do. And ...
    Request PDF

    Impact of Number of Bidders on Competition 

    Source: Journal of Construction Engineering and Management:;1983:;Volume ( 109 ):;issue: 001
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: A contractor seeking the highest expected value from each competitive bid will lower the markup, as the number of competitors increases. The contractor's competitors can be expected to do likewise, and their adjustments ...
    Request PDF

    Construction Congestion Cost (CO<sup>3</sup>) Traffic Impact and Construction Cost 

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: The Construction Congestion Cost System (CO
    Request PDF

    Construction Congestion Cost (CO<sup>3</sup>) Basic Model 

    Source: Journal of Construction Engineering and Management:;2000:;Volume ( 126 ):;issue: 002
    Author(s): Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: The Construction Congestion Cost System (CO
    Request PDF

    Time‐Cost Trade‐Off Among Related Activities 

    Source: Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003
    Author(s): Rehab Reda; Robert I. Carr
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes the typical pragmatic approach that construction planners taken in performing time‐cost trade‐off (TCT). In general, projects have major dominant characteristics, operations, or resources whose planning ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian