Search
Now showing items 1-1 of 1
Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure
Publisher: ASCE
Abstract: This paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as ...
CSV
RIS