YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Closure to “<i>Schedule ‘Games’ People Play, and Some Suggested ‘Remedies’</i>” by James G. Zack Jr. (April, 1992, Vol. 8, No. 2) 

    Source: Journal of Management in Engineering:;1993:;Volume ( 009 ):;issue: 003
    Author(s): James G. Zack, Jr.
    Publisher: American Society of Civil Engineers
    Request PDF

    Schedule ‘Games’ People Play, and Some Suggested ‘Remedies’ 

    Source: Journal of Management in Engineering:;1992:;Volume ( 008 ):;issue: 002
    Author(s): James G. Zack, Jr.,
    Publisher: American Society of Civil Engineers
    Abstract: The intended purpose of construction scheduling is to assist with proper planning and coordination of a project. All too frequently, construction schedules are used primarily to help build claims against project owners. ...
    Request PDF

    “Claimsmanship”: Current Perspective 

    Source: Journal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 003
    Author(s): James G. Zack, Jr.
    Publisher: American Society of Civil Engineers
    Abstract: Owners, engineers, and contractors used to focus on designing and building projects as a team for the mutual benefit of all parties. Over the past two decades, as project complexity has increased, deadlines tightened, and ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian