YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Developing an Approach to Develop and Validate a Lean Construction Plan Using Performance Evaluation of Repetitive Subprojects 

    Source: Journal of Architectural Engineering:;2018:;Volume ( 024 ):;issue: 001
    Author(s): Heravi Gholamreza;Rashid Mehdi
    Publisher: American Society of Civil Engineers
    Abstract: Waste, a non-value-added activity or process, is among the issues in every project that directly influence its main objectives, including time, cost, and quality. Lean thinking, following its success in the manufacturing ...
    Request PDF

    Probabilistic Assessment of Cost, Time, and Revenue in a Portfolio of Projects Using Stochastic Agent-Based Simulation 

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 005
    Author(s): Farshchian Mohammad Mahdi;Heravi Gholamreza
    Publisher: American Society of Civil Engineers
    Abstract: Unforeseen conditions and uncertainties typically surround construction projects during the execution phase. These uncertainties are the main reason for schedule delays and cost overruns. Stochastic simulation models have ...
    Request PDF

    Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran 

    Source: Journal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 011
    Author(s): Charkhakan Mohammad Hadi;Heravi Gholamreza
    Publisher: American Society of Civil Engineers
    Abstract: The majority of qualitative risk assessment studies on construction projects assess manageability indicators (e.g., detectability, preventability, and controllability) independently of risk probability and impact, two ...
    Request PDF

    An Integrated BIM-GIS Framework for Building Quality Assessment Based on Price Estimation: Evaluating Design and Location Factors 

    Source: Journal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 004:;page 04026020-1
    Author(s): Ojghaz, Amir Shahbazi; Heravi, Gholamreza
    Publisher: American Society of Civil Engineers
    Abstract: AbstractThe quality of buildings is shaped largely by design and planning strategies established in the early stages of a project. Despite growing interest in data-informed decision-making, there still is a lack of integrated ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian