YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-7 of 7

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Model for Understanding, Preventing, and Resolving Project Disputes 

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 003
    Author(s): Panagiotis Mitropoulos; Gregory Howell
    Publisher: American Society of Civil Engineers
    Abstract: Based on the comparative analysis of 24 construction disputes, this paper presents a process model that explains the development of disputes. The model examines the combined effect of project uncertainty, contract, working ...
    Request PDF

    Closure to “Model for Understanding, Preventing, and Resolving Project Disputes” by Panagiotis Mitropoulos and Gregory Howell 

    Source: Journal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 002
    Author(s): Panagiotis Mitropoulos; Gregory Howell
    Publisher: American Society of Civil Engineers
    Request PDF

    Interaction between Subcycles: One Key to Improved Methods 

    Source: Journal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 004
    Author(s): Gregory Howell; Alexander Laufer; Glenn Ballard
    Publisher: American Society of Civil Engineers
    Abstract: The relationship of one subcycle to another can be complex. Productivity suffers when the output of one subcycle delays a following step or when resources required for one subcycle are engaged in another. Isolating subcycles ...
    Request PDF

    Application of Time Buffers to Construction Project Task Durations 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 010
    Author(s): Marion M. Russell; Gregory Howell; Simon M. Hsiang; Min Liu
    Publisher: American Society of Civil Engineers
    Abstract: For this research, a time buffer is defined as the extra time added during planning to individual task durations to compensate for uncertainty and protect against workflow variation to assure a predictable hand-off to ...
    Request PDF

    Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System 

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 002
    Author(s): Marion M. Russell; Min Liu; Gregory Howell; Simon M. Hsiang
    Publisher: American Society of Civil Engineers
    Abstract: Buffers are used in construction to absorb variation caused by the inherent complexity and uncertainty present in construction projects. The case studies presented here focus on time buffer added to construction task ...
    Request PDF

    “Oops” Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 008
    Author(s): Kiarash Hajifathalian; Gregory Howell; Brad W. Wambeke; Simon M. Hsiang; Min Liu
    Publisher: American Society of Civil Engineers
    Abstract: “The Oops Game” explores the question, how much should be invested in planning? The simulation offers the opportunity to reduce the risk of an “Oops” by collecting more information or to go ahead and make the choice with ...
    Request PDF

    “Oops” Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 008
    Author(s): Kiarash Hajifathalian; Gregory Howell; Brad W. Wambeke; Simon M. Hsiang; Min Liu
    Publisher: American Society of Civil Engineers
    Abstract: “The Oops Game” explores the question, how much should be invested in planning? The simulation offers the opportunity to reduce the risk of an “Oops” by collecting more information or to go ahead and make the choice with ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian