YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Fast and Accurate Risk Evaluation for Scheduling Large-Scale Construction Projects 

    Source: Journal of Computing in Civil Engineering:;2011:;Volume ( 025 ):;issue: 005
    Author(s): Dho Heon Jun; Khaled El-Rayes
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents the development of a novel probabilistic scheduling model that enables fast and accurate risk evaluation for large-scale construction projects. The model is designed to overcome the limitations of ...
    Request PDF

    Optimizing Resource Leveling in Construction Projects 

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 011
    Author(s): Khaled El-Rayes; Dho Heon Jun
    Publisher: American Society of Civil Engineers
    Abstract: Construction schedules, generated by network scheduling techniques, often cause undesirable resource fluctuations that are impractical, inefficient, and costly to implement on construction sites. This paper presents the ...
    Request PDF

    Multiobjective Optimization of Resource Leveling and Allocation during Construction Scheduling 

    Source: Journal of Construction Engineering and Management:;2011:;Volume ( 137 ):;issue: 012
    Author(s): Dho Heon Jun; Khaled El-Rayes
    Publisher: American Society of Civil Engineers
    Abstract: Construction scheduling techniques often generate schedules that cause undesirable resource fluctuations that are inefficient and costly to implement on site. This paper presents the development of a novel multiobjective ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian