Show simple item record

dc.contributor.authorJ. F. Kiefner
dc.contributor.authorT. P. Forte
dc.date.accessioned2017-05-08T23:17:33Z
dc.date.available2017-05-08T23:17:33Z
dc.date.copyrightSeptember, 1984
dc.date.issued1984
dc.identifier.issn0195-0738
dc.identifier.otherJERTD2-26400#362_1.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/98294
dc.description.abstractAn analytical model is presented for predicting hydrostatic retest intervals in liquid pipelines which are subjected to frequent large pressure cycles. The model utilizes pressure cycle history, hydrostatic test history, and fatigue crack growth rate data for the pipe material to calculate time to failure for the largest possible defect which could have survived a previous hydrostatic test. An example problem is described which shows the value of maximizing the margin between test pressure and operating pressure in order to achieve long time intervals between tests.
dc.publisherThe American Society of Mechanical Engineers (ASME)
dc.titleHydrostatic Retesting of Existing Pipelines
dc.typeJournal Paper
dc.journal.volume106
dc.journal.issue3
dc.journal.titleJournal of Energy Resources Technology
dc.identifier.doi10.1115/1.3231066
dc.journal.fristpage362
dc.journal.lastpage368
dc.identifier.eissn1528-8994
dc.keywordsHydrostatics
dc.keywordsPipelines
dc.keywordsPressure
dc.keywordsHydrostatic testing
dc.keywordsCycles
dc.keywordsFailure
dc.keywordsFatigue cracks AND Pipes
dc.treeJournal of Energy Resources Technology:;1984:;volume( 106 ):;issue: 003
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record