• Login
    View Item 
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   DSpace Home
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Geotechnical Issues and Answers During Construction of the Trans-Alaska Pipeline

    Thumbnail
    View/Open
    JERTD2-26374#128_1.pdf (572.7Kb)
    Date
    1979
    Author
    Ulrich Luscher
    Howard P. Thomas
    Metadata
    Show full item record
    Abstract
    The Trans-Alaska Oil Pipeline completed in 1977 was an unprecedented construction project. Some of the most challenging problems faced were in the geotechnical field. In the format of issues and answers, this paper highlights the activities and decision-making functions of the field engineering organization which was developed. This organization was responsive to the identified need for field confirmation of geotechnical conditions during construction and for assurance of adequacy of as-built construction. Appropriate procedures and lines of communication were established to satisfy these needs.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/92035
    Collections
    • Journal of Energy Resources Technology

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV