Show simple item record

dc.contributor.authorP. Phurkhao
dc.contributor.authorM. K. Kassir
dc.date.accessioned2017-05-08T22:40:29Z
dc.date.available2017-05-08T22:40:29Z
dc.date.copyrightJanuary 2005
dc.date.issued2005
dc.identifier.other%28asce%290733-9399%282005%29131%3A1%2897%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/85998
dc.description.abstractThis technical note presents numerical results to predict the corrosion initiation time of reinforced concrete bridge decks using measured surface chloride accumulation. Based on actual core measurements, the surface chloride, which is mainly derived from the deicing salts used during winter maintenance operations, is assumed to increase linearly over a period of time and then remains constant afterward. The chloride ions penetrate the concrete by diffusion and corrosion is initiated when the concentration of the ions around the reinforcement steel reaches a critical value needed to break the passive film surrounding the steel. The corrosion initiation time is computed for different values of the diffusion coefficient and the concrete cover. Such results are useful for scheduling bridge deck maintenance and rehabilitation programs.
dc.publisherAmerican Society of Civil Engineers
dc.titleNote on Chloride-Induced Corrosion of Reinforced Concrete Bridge Decks
dc.typeJournal Paper
dc.journal.volume131
dc.journal.issue1
dc.journal.titleJournal of Engineering Mechanics
dc.identifier.doi10.1061/(ASCE)0733-9399(2005)131:1(97)
dc.treeJournal of Engineering Mechanics:;2005:;Volume ( 131 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record