Show simple item record

dc.contributor.authorGang Mei
dc.contributor.authorAhsan Kareem
dc.contributor.authorJeffrey C. Kantor
dc.date.accessioned2017-05-08T22:40:22Z
dc.date.available2017-05-08T22:40:22Z
dc.date.copyrightApril 2004
dc.date.issued2004
dc.identifier.other%28asce%290733-9399%282004%29130%3A4%28459%29.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/85907
dc.description.abstractIn this paper, a “third generation” benchmark problem that focuses on the control of wind excited response of a tall building, using the Model Predictive Control (MPC) scheme, is presented. A 76 story, 306 m tall concrete office tower proposed for the city of Melbourne, Australia, is being used to demonstrate the effectiveness of MPC. The MPC scheme is based on an explicit use of a prediction model of the system response to obtain the control actions by minimizing an objective function. Optimization objectives in MPC include minimization of the difference between the predicted and desired response trajectories, and the control effort subjected to prescribed constraints. By incorporating input/output hard constraints, the MPC scheme provides an optimal control force that satisfies the prescribed constraints.
dc.publisherAmerican Society of Civil Engineers
dc.titleModel Predictive Control of Wind-Excited Building: Benchmark Study
dc.typeJournal Paper
dc.journal.volume130
dc.journal.issue4
dc.journal.titleJournal of Engineering Mechanics
dc.identifier.doi10.1061/(ASCE)0733-9399(2004)130:4(459)
dc.treeJournal of Engineering Mechanics:;2004:;Volume ( 130 ):;issue: 004
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record