| dc.contributor.author | Waon‐Ho Yi | |
| dc.contributor.author | Ralf Peek | |
| dc.date.accessioned | 2017-05-08T22:36:59Z | |
| dc.date.available | 2017-05-08T22:36:59Z | |
| dc.date.copyright | July 1993 | |
| dc.date.issued | 1993 | |
| dc.identifier.other | %28asce%290733-9399%281993%29119%3A7%281376%29.pdf | |
| dc.identifier.uri | http://yetl.yabesh.ir/yetl/handle/yetl/83913 | |
| dc.description.abstract | Experimental errors are inevitable in pseudodynamic testing. Some of these errors can be monitored during the test, but, due to limitations in control system, they cannot be eliminated. For example, one cannot control exactly the displacements that are actually imposed on the structure at each time step. This paper focuses on a technique to minimize the cumulative effect of such control errors. For this purpose, a posterior adjustment of the time increment from a target value | |
| dc.publisher | American Society of Civil Engineers | |
| dc.title | Posterior Time‐Step Adjustment in Pseudodynamic Testing | |
| dc.type | Journal Paper | |
| dc.journal.volume | 119 | |
| dc.journal.issue | 7 | |
| dc.journal.title | Journal of Engineering Mechanics | |
| dc.identifier.doi | 10.1061/(ASCE)0733-9399(1993)119:7(1376) | |
| dc.tree | Journal of Engineering Mechanics:;1993:;Volume ( 119 ):;issue: 007 | |
| dc.contenttype | Fulltext | |