Show simple item record

dc.contributor.authorBrian S. Maxwell
dc.contributor.authorHoward A. Wells
dc.date.accessioned2017-05-08T22:36:04Z
dc.date.available2017-05-08T22:36:04Z
dc.date.copyrightSeptember 2015
dc.date.issued2015
dc.identifier.other51475256.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/83376
dc.description.abstractTo eliminate a grade crossing of rail lines, the Port of Vancouver USA, in Vancouver, Washington, elected to route a new line to its entrance beneath a bridge carrying a major north–south line. The new line would be well below the 100-year flood elevation of the adjacent Columbia River. To protect it from most flood events, the port constructed an innovative trench structure that will ensure uninterrupted rail service during high water and minimize infiltration from floodwaters.
dc.publisherAmerican Society of Civil Engineers
dc.titleBelow the Flood Line
dc.typeJournal Paper
dc.journal.volume85
dc.journal.issue8
dc.journal.titleCivil Engineering Magazine Archive
dc.identifier.doi10.1061/ciegag.0001028
dc.treeCivil Engineering Magazine Archive:;2015:;Volume ( 085 ):;issue: 008
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record