Show simple item record

dc.contributor.authorChen Qiang
dc.contributor.authorZhang Yun
dc.contributor.authorXiang Hua-wei
dc.contributor.authorWang Shu-guo
dc.date.accessioned2017-05-08T22:33:46Z
dc.date.available2017-05-08T22:33:46Z
dc.date.copyrightMarch 2015
dc.date.issued2015
dc.identifier.other49745053.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/82661
dc.description.abstractWith Wanzhou Yangtze River Bridge as an engineering example, FEM is applied to simulate the whole bridge construction process to optimize the truss member assembling sequences and determine the critical member bars that should be monitored. Real-time or fixed time data on stress and deflection are collected through a wireless integrated test system. Thus, the status of stress and deflection for the cantilever structure is under good control to ensure safety and stability. Measurements and theoretical computations of temperature effects are valuable for closure time selection and temperature deformation adjustment. The middle span is closed under the conditions of “zero error and zero additional stress”. A successful construction of this bridge provides experience and guidance for other similar bridges.
dc.publisherAmerican Society of Civil Engineers
dc.titleConstruction Control Techniques of Long-Span Steel Truss Arch Bridges
dc.typeJournal Paper
dc.journal.volume9
dc.journal.issue1
dc.journal.titleJournal of Highway and Transportation Research and Development (English Edition)
dc.identifier.doi10.1061/JHTRCQ.0000423
dc.treeJournal of Highway and Transportation Research and Development (English Edition):;2015:;Volume ( 009 ):;issue: 001
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record