• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Hydrologic Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Long-Range Hydrologic Forecasting in El Niño Southern Oscillation-Affected Coastal Watersheds: Comparison of Climate Model and Weather Generator Approach

    Thumbnail
    View/Open
    47162890.pdf (4.686Mb)
    Date
    2015
    Author
    Suresh Sharma
    Puneet Srivastava
    Xing Fang
    Latif Kalin
    Metadata
    Show full item record
    Abstract
    Streamflow forecasting is essential for the proper management of water resources, especially when severe droughts cause water resource scarcity. Streamflow forecasting using physically based or conceptual hydrologic models is a common approach. However, these models rely on the predicted climate data, which are at times unrealistic and depart significantly from actual observed data, resulting in an unreliable forecast. Because the sea surface temperature (SST) in the Niño 3.4 region has a potential teleconnection with streamflow in the El Niño Southern Oscillation (ENSO)-affected regions, the streamflow forecasting ability of a model can be enhanced by using SST in data-driven models. In fact, conceptual models cannot incorporate SST data as input. Therefore, in this study, an adaptive neuro-fuzzy inference system (ANFIS) was used to infuse SST data (from the equatorial Pacific) with predicted precipitation and temperature for streamflow forecasting with one-to-three months’ lead time. For the forecasted climate data, two methods were used: (1) ENSO-conditioned weather sequences, and (2) climate data from the Climate Forecast System version 2 (CFSv2) model. The forecasted streamflow, after systematic error correction, was postvalidated with observed streamflow from 1982 to 1988. The streamflow forecasting at one-month lead time was found to be better than that of the three-month lead time. The root-mean square error and percentage bias for one-month lead time forecast using CFSv2 were
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/81639
    Collections
    • Journal of Hydrologic Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV