Show simple item record

dc.contributor.authorJingfeng Yuan
dc.contributor.authorAlbert P. C. Chan
dc.contributor.authorBo Xia
dc.contributor.authorMirosław J. Skibniewski
dc.contributor.authorWei Xiong
dc.contributor.authorChuang Ji
dc.date.accessioned2017-05-08T22:29:12Z
dc.date.available2017-05-08T22:29:12Z
dc.date.copyrightJune 2016
dc.date.issued2016
dc.identifier.other46521999.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/81402
dc.description.abstractPublic private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.
dc.publisherAmerican Society of Civil Engineers
dc.titleCumulative Effects on the Change of Residual Value in PPP Projects: A Comparative Case Study
dc.typeJournal Paper
dc.journal.volume22
dc.journal.issue2
dc.journal.titleJournal of Infrastructure Systems
dc.identifier.doi10.1061/(ASCE)IS.1943-555X.0000272
dc.treeJournal of Infrastructure Systems:;2016:;Volume ( 022 ):;issue: 002
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record