Show simple item record

dc.contributor.authorWalid Tizani
dc.contributor.authorTheodoros Pitrakkos
dc.date.accessioned2017-05-08T22:28:34Z
dc.date.available2017-05-08T22:28:34Z
dc.date.copyrightOctober 2015
dc.date.issued2015
dc.identifier.other46231804.pdf
dc.identifier.urihttp://yetl.yabesh.ir/yetl/handle/yetl/81240
dc.description.abstractThis paper assesses the performance of a newly developed blind bolt, intended for use in constructing bolted moment-resisting connections to concrete-filled tubular steel profiles. A total of ten connection tests are reported, with each configuration having been subjected to a predominantly tensile force in a representation of the tension region of a typical moment connection. The test variables included type of fastener, addition of concrete to the tube, strength of the concrete, spacing among bolts, and bolt class. On the basis of deformability response, the benefits of filling the tubular member with concrete are highlighted. The favorable performance that results from using a relatively, high-grade concrete infill is also highlighted. The addition of a concrete infill to the tube stiffens and strengthens the otherwise relatively flexible tube walls, enhancing overall connection behavior in terms of stiffness, strength, and ductility. The performance of connections to concrete-filled tubular steel profiles using blind bolts with headed anchors is shown to be suitable for moment-resisting construction.
dc.publisherAmerican Society of Civil Engineers
dc.titlePerformance of T-Stub to CFT Joints Using Blind Bolts with Headed Anchors
dc.typeJournal Paper
dc.journal.volume141
dc.journal.issue10
dc.journal.titleJournal of Structural Engineering
dc.identifier.doi10.1061/(ASCE)ST.1943-541X.0001169
dc.treeJournal of Structural Engineering:;2015:;Volume ( 141 ):;issue: 010
dc.contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record