• Login
    View Item 
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    •   DSpace Home
    • ASCE
    • Journal of Bridge Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Cost-Efficient Procurement of Bridge Infrastructures by Incorporating Life-Cycle Cost Analysis with Bridge Management Systems

    Thumbnail
    View/Open
    46109291.pdf (1.456Mb)
    Date
    2015
    Author
    Mohammed
    Safi
    Håkan
    Sundquist
    Raid
    Karoumi
    Metadata
    Show full item record
    Abstract
    Life-cycle cost analysis (LCCA) has recognized potential for rationalizing bridge procurement, but its use in this context is far from systematic. The integration of LCCA findings in decisions is often far from robust. Furthermore, although most bridge management systems (BMSs) include databases of relevant information, agencies do not use them effectively to improve future bridge-investment decisions. This paper introduces a comprehensive approach to help agencies exploit their BMSs to procure the most cost-efficient bridge design through fair design-build (D-B) tendering processes. The approach incorporates use of a novel LCCA technique, LCC added-value analysis, that can be conveniently integrated with public agencies' established procurement procedures and maintains contractors' freedoms in D-B processes. The proposed approach allows bridge procurers to establish monetary LCC-efficient benchmarks and embed them in tender documents as core specifications. Hence the lowest LCC bid, rather than the lowest bid in initial investment terms, can be used as the contract award criterion. The Swedish Transport Administration has recently procured several bridges using the approach, thereby gaining considerable cost savings. A case study provides insights into various aspects of bridges’ LCC and illustrates analytical steps that other agencies could apply in bridge procurement. The study shows that the use of D-B processes, together with the lowest LCC bid as the contract award criterion, afford greater opportunities to consider LCC aspects in bridge procurement, rather than relying on traditional contracts and the lowest-bid criterion.
    URI
    http://yetl.yabesh.ir/yetl/handle/yetl/81167
    Collections
    • Journal of Bridge Engineering

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV
     

     

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister

    Statistics

    View Usage Statistics

    DSpace software copyright © 2002-2015  DuraSpace
    Contact Us | Send Feedback
    Theme by 
    @mire NV